Electrical & Instrument Lead

Location:
Singapore, Singapore
Posted:
March 11, 2013

Contact this candidate

Resume:

Curriculum Vitae

Discipline: Lead E & I Inspector/Field

Engineer

Name : Cho Siew Hee

Date of Birth : 09.June.1961 Age: 52

Status : Married

Contact tel. : +86-186*-****-*** currently

in use

+601*-****-*** h/phone ( Malaysia )

Nationality : Malaysian Chinese

Language : Fluent in English, B.Malaysia, and Mandarin

E-mail : i) abonno@r.postjobfree.com

ii) abonno@r.postjobfree.com

Computer Literacy : Microsoft WinWord, Excel, Access, etc

Academic : Malaysia Certificate of Education - 'O' Levels

Technical : Diploma in Instrumentation- Industrial Technology

Experience Summary :

1. Over 27 years of experience in Electrical/Instrument related

construction activities in Oil/Gas facilities on/offshore, FPSO's, DP3

Pipe-Laying Vessels, Semi-Submersible Drilling Rigs, Platforms/Modules

fabrication, Paper-Mills, Refineries/Chemical plants, Hi-Tech Clean-

Room/Wafer plants, etc

2. Assignments includes as an Lead E/I inspector, Field Engr in various

high profile and demanding projects, providing a strong technical

knowledge and expertise, performing responsibilities, liaise with project

management team, contractors, systems vendors and engineering

consultants, reports to Project/Constr Manager.

3. Familiar and ability to perform within project schedules, datelines,

ensures all related Instr/elect activities conforms to P&ID and M&E

drawings, codes, specifications and technical requirements in Oil/Gas

industries, Maritime Classification (ABS, Lloyds, DNV, etc), Hi-Tech

Codes etc.

4. Assist in commissioning of Power Generation, Management and Distribution

systems, Process and Control Instrumentation, Tele-Communications, CCTV,

F&G systems, Vessel Management systems, DCS/PLC controls, Life Safety &

Security systems, Plant Start-up and test runs, FMEA tests, Sea Trials,

etc

Construction, Inspection and Commissioning activities such as:

1. Conduct inspection on elect/instr installations such as Small

Power/lightings, HV/LV cabling/ ladders/trays, Motors and DB panels,

FAT's, Fire/Gas Detection, Heat tracing system, VFD's, MCC/LV switchgear

panels, Diesel/Emer generator, UPS system, Charger battery banks, CO2

System, Gen HVAC system, Earthing/Grounding system, Cathodic Anti-growth

system, Fire Damper Controls, etc

2. Commissioning/equipment functional testing, torque test & IR test on LV

eqpt. MCC/DB and motors, cabling IR test and loop checks, functions

checks on eqpt controls, Emer Stop & HOA, etc.

3. Pre-Comm checks, cold/hot loop checks of instruments and controls for

Marine systems such as Bilge/Ballasting, Fresh/Seawater, Fuel Oil, Hvac,

Compressed Air, Motorized and Hydraulics Valves Controls, Thruster

Controls, etc

4. Inspection and testing of instr process/monitoring devices, tank radar

system, CCTV, LSS, Fire/Gas Detection system, FMCS and SCADA functions,

PLC and Marshalling panels, Navigation/Aviation warning, DCS panel,

Paging/public address system, Process transmitters, gauges and switches,

tubing leak test, etc.

5. Review and conduct site inspections to ensure fabrication, installations

are as per specifications. Resolves and clarify technical queries.

Acceptance/verification of material delivery, system turnover package, as-

built drawings, handover of Acceptance Reports and documentation.

July.2012~Current.2013

Position held: ELECT/INSTR SUPT

Assignment: CAMERON PROCESS SYSTEMS ( MeG Module )

Project: LIWAN 3-1 DeepWater Gas Field

COOEC/QingDao Yard, China

i) Responsible for all elect & instr installations for fabrication of

a Mono-Ethylene Glycol module.

ii) Review P&ID's and liaise with Yard Engineering to ensure all

procurement, installations are in accordance to project

specifications.

iii) Conducts inspections on E/I installations and material deliveries,

resolves clashes, coordination of interfacing activities..

iv) Clarifications of technical queries, and verifications of

modifications and site changes

v) Lead interface between vendors, package systems and coordination

between Construction/Inspections & Commissioning Team.

Feb.2011~June.2012

Position held: LEAD E/I INSPECTOR

Assignment: PETROFAC LLC

Project: FPSO BERANTAI

Keppel Tuas Shipyard, Singapore

i) Review Insp and Test Plan, Construction and Hook-Up drawings,

Electrical Standard Installation Practise

ii) Attends Vessel Construction/Integration/QaQc meeting to discuss

progress, resolves construction and quality issues

iii) Conducted material delivery inspections, attends FAT inspections, site

installations and mechanical completion inspections.

iv) Coordinates and initiate vendor call-outs for site completion,

assembly and pre-commissioning of vendor equipment, switchboards,

skids packages.

v) Review yards progress, feedback construction queries and conflicts to

engineering, ensure proper work coordination between trades.

Aug.~Nov.2010

Position held: INSTR COMMISSIONING

Assignment: MASTER MARINE (NORWAY)

Projects: L205 HAVEN, Jack-Up Rig Project

AS Nymo Yard, Eydehavn, Norway 2010

i) Conduct Pre-comm inspections as per PID and Mechanical Completion

Scope. Verification on instrument installations are as layout, detail

hook-ups and process requirements. Generate punch-lists on

discrepancies and incomplete tasks. Verify insulation resistance and

continuity tests on cablings.

ii) Verify cold and hot loop checks on cables, instr calibration, testing

to Field stations, marshalling cabinets Valve Control cabinets, and

verification of loops to Engine Control Room Vessel Management System.

iii) Testing of Fire and Gas devices and loops tests to confirm

functionality, alarms and settings.

iv) Mark-up As-Built single line drawings, loop drawings changes, verify

VMS graphics changes and site changes.

Dec.2009~June.2010

Position held: ELECT/INSTR INSPECTOR

Assignment: NOBLE DRILLING SERVICES

Projects: NOBLE JIM DAY Semi-Submersible DP3 Drill Rig

Project JSL, Singapore 2010

i) Verifications and Inspections of Electrical and Instrumentation

installations, ITRs' inspections, resolving site issues, liaise with

engineering on site clashes, package interfaces, design conflicts,

shortages, etc

ii) Ensure work compliance to class rules and regulations,

installations compliance to hazardous zones, etc.

iii) Monitor shipyard progress, quality works, site changes, coordinate

material movements, etc.

iv) Responsible for Thruster Controls, Ballast Controls System, Bilge, Bulk

Storage System, Mud Jetting Systems, etc

v) Liaise with project engineer and design engineering on resolving of

equipment shortages, damages, non-conformance issues, site

instructions. Reports to Construction Manager on progress, site issues

and interfacing issues, etc.

Nov.2007~Sept.2009

Position held: E&I SENIOR SUPERVISOR

Assignment: BLUEWATER ENERGY SERVICES B.V. ( FPSO Projects )

Projects:

4) SYMS-FPSO PengBo (Hook-Up & Commissioning) Bohai Phase2 Offshore

China Sept.2009 3) Aoka Mizu

FPSO (Commissioning ) Keppel Verolme Yard, Rotterdam, Netherlands

Apr.2009

2) BlackTip CALM BUOY Project Britoil Offshore Yard,

Batam, Indonesia Jan.2009

1) SYMS Soft Yoke Mooring System Chiwan-Sembawang Yard, Shenzhen,

China Sept.2008

i) Inspections and on-shore commissioning of all electrical and instrument

equipment, electrical switchboard, Fire and gas systems, electro-

hydraulics system on SYMS Structure during construction stages in

Shenzhen, Chiwan-Sembawang yard, China

ii) FAT, installation and commissioning of Solar Power system, Subsea PLEM

Hydraulic power pack system on BlackTip Calm Buoy Project in Batam,

Indonesia. Mark-up as-built and final compilation of installations

documentation.

iii) Mark-up, as-built of loops and verification of Trace Heating

installations, Small power and Lightings system on topsides modules on

Aoka Mizu FPSO in Keppel Verolme yard, Rotterdam, Netherlands

iv) Oversee tie-in and hook-up of all electrical, Instrument, Fire and Gas

system during the offshore Hook-Up stages for the SYMS-PengBo FPSO in

Bohai Bay, offshore China

v) Monitor, coordinate and close-out completion of

electrical/instrument/piping workpacks reports.

Aug.2006~Nov.2007

Position held: ELECT/INSTR INSPECTOR

Assignment: Qa/Qc Dept ( Projects Div. )

SSPL Yard, Singapore

Project:

2) Sapura-Crest 3000T DP Class.2 Derrick Pipelay Vessel,

SSPL, Singapore Nov.2007

1) Discovery 534 - Transocean Drillship Refurbishment/Upgrade, SSPL,

Singapore Mar.2007

i) Inspections of all electrical/instrumentation/F&G system installations,

cables glanding and terminations, cable trays layouts, etc

ii) Verification of cabling loops, insulation resistance checks, from field

to Field Stations, Eng Control Room, switchboard rooms, etc

June.2005 ~ May.2006

Position held: Elect/Instr Field Supt

Assignment: FLUOR DANIEL EASTERN INC. (USA)

Project: Corning Display Technologies Taichung Hi-Tech Plant, Taiwan

ROC May.2006

i) Responsible for Plant and Equipment controls and monitoring systems,

grounding systems, Power distribution to Finishing Assembly Lines and

Office buildings, Buildings GHVAC system, etc for the constructionof a

Hi-Tech Plant.

ii) Overseeing of Lightings and Un-interrupt Power Supply systems, Security

and Communications system.

iii) Pre-commissioning, trouble-shootong and and start-up of above systems

from field installation to Plant FMCS system.

Feb.2001 ~ June.2005

Position Held: Senior Elect/Instr QC Inspector

(Contracted to... *as below )

Assignment: 1. SaiBos/Technip @ Sime Darby Engineering

Johor, Malaysia

2. QaQc Dept @ Sembawang Shipyard

Singapore

3. QaQc Dept @ SembCrop Maritime and Offshore Engr.

Singapore

Projects:

vii) AMENAM Module Compression Module Integration Nigeria

Feb.2005

vi) ERHA FPSO FPSO Exxon Mobil Nigeria

Oct.2004

v) CNOOC 114 FSO FSO China National Oil Corp

Aug.2004

iv) JASCON-5 DP3 Pipe Laying Vessel Consolidated

Project Limited May.2003

iii) SAIPEM 3000 DP3 -2400T Heavy Lift Vessel Conversion

SAIPEM Aug.2002

ii) SEA EAGLE FPSO FPSO Shell

Exploration Nov.2001

i) SHELL SOORSCH FSU FSU Shell Exploration

Feb.2001

Feb 2000 ~ Feb 2001

Position Held: Instrument Field Supt

Assignment: Fluor Daniel International Malaysia ( FDIM )

Location: Kulim Hi-Tech Indust. Park, Kedah Malaysia

Project: SILTERRA Silicon Wafer Hi-Tech Plant,

. Responsible for all instrumentation installation activities under

Facility Monitering and Controls System, Life Safety and General HVAC

system.

. Seconded to Testing & Commissioning Team during the Start-

up/Commissioning period.

. Seconded to Facilities Maintenance Team for three months,

as part of Reliability Team after Start-Up.

June 99 ~ Feb 2000

Position Held: Elect/Instr. Supt

Assignment: AGRA-BIRWELCO ENGINEERING ( USA )

Location: Malaysia Shipyard and Engineering. Johor.

Malaysia

Projects: 1. TRANSFER LIGHT EXCHANGERS Furnaces Units A ~ D

2. QUENCH HEADER Furnaces Units E ~ H, Singapore Olefins

Furnace Project

Mar 98 ~ June 99

Position Held: Senior Instr/Elect Supv

Assignment: STORK COMPRIMO CONSULTANCY (Malaysia)

Project: MALAYSIAN NEWSPRINT INDUST. RECYCLED PAPER

MILL

Location: Mentakab, Pahang Malaysia

. Overall in charge of all instr/elect installations in Raw Water and

Effluent Treatment Plant, Stock Preparation Sector, Recovery Paper

Warehouse and Water Intake Station

. Assist in plant commissioning checks from field to DCS control room.

. Attached to the MNI Maintenance/Facilities Dept after the successfully

start-up, for reliability period and operation of Plant.

Sept 97 ~ Mar 98

Position Held: Instr & Elect Project Supt

Assignment: Project Management Team

Location: Promet Fabricators Sdn. Bhd. Teluk

Rumania, Johore, Malaysia

Project: STJT-A SOTONG TOPSIDES PLATFORM PETRONAS - CARIGALI

Project

0ct 94 ~ August 97

Position Held: Elect & Instr QC Inspector

Assignment: Qa/Qc Dept @ Sembawang Project Conversion Team

Location: Sembawang Shipyard Ltd. S'pore

Projects:

1. LU FENG 22-1 Self-Assembly Modules Project

CNOOC 1997

2. SUPERSTAR GEMINI Cruise liner - Retrofit/Refurbishment

S'PORE 1997

3. TANTAWAN EXPLORER FPSO - SINGLE BUOY MOORING

1996

4. PROSTAR FSO II FSO - SINGLE BUOY MOORING

1996

5. KARIMUN DOCK 210,000 TLC floating dock

INDONESIA 1995

6. SOLITAIRE DP Pipelaying Vessel Conversion ALLSEAS

1994

June 93 ~ Sept 94

Position Held: Instr & Elect QC Inspector

Assignment: Qa/Qc Dept @ MSE Project Management Team

Location: Malaysia Shipyard and Engr.

P.Gudang. Johor, Malaysia

Projects: 1. D-35 PLATFORM - Compression and Power Generation Modules

SHELL Project

2. GUNTUNG 'D' PLATFORM - Compression and MSF Modules

EPMI Project

Feb ~ June 93

Position Held: Senior I & E Commissioning Technician

Assignment: TPC/TPE Facilities & Maintenance Dept

Project: TITAN PETRO-CHEMICAL & POLYETHYLENE Plant (

Phase II )

Location: P.Gudang. Johor Malaysia

April ~ Dec 92

Position Held: E & I Quality Control Inspector.

Assignment: Qa/Qc Dept @ MSE Project Management Team

Location: M'sia Shipyard and Engr. P.Gudang. Johor, Malaysia

Projects:

1. BAYAN BYR-A Riser Platform

SSB Project

2. SELEGI-C, SELEGI-E MSF Platform

EPMI Project

3. TABU-B TOPSIDE Production Platform

EPMI Project

1981 ~ 1992

Position Held: Instr/Elect Hook-up Leadman/Technician

Assignment: under contract to as below

1. Wescon ( Asia ) Pte Ltd - On/Offshore Hook-Up and

Commissioning

2. Comex Offshore -

Retrofit/Refurbishment

3. Shapadu Offshore -

Retrofit/Refurbishment

4. IES Enterprise - Offshore

Hook-Up and Commissioning

5. Hyundai Construction - Expansion of Pertamina

Terminal, Indonesia

Projects:

1. SLUDGE CATCHER Project, T'ganu Crude Oil Terminal

Kertih. Trengganu

2. TEK-A GasLift Platform .SSB

On/Offshore East M'sia

3. SSB platforms Hook-Up, Retrofit/Refurbisht

Sabah, East M'sia

4. EMPI platforms Hook-Up, Retrofit

Offshore Trengganu

5. TRENGGANU Crude Oil Terminal Parker Retrofit Team

Onshore Trengganu

6. PROMET Fabrication Yard DeepSea Semi-Submersible Rig

Singapore

7. MARATHON LeTourneau Fab Yard Rig Fabrication

Singapore

8. PERTAMINA - DUMAI Terminal Hydro-Cracking Terminal

Sumatra, Indonesia

. Loop-checks and testing of pneumatic, electronic and electrical

instruments of skid packages installations such as Gas Receiving Skid,

Process and Gas Metering skid to Central Control Room at Sludge Catcher

project -

Kertih. Trengganu

. Servicing and retrofit of process and control instruments, tubing works

on local control panels, Deluge, pneumatic shutdown panels, etc on EPMI

platforms - Offshore

Trengganu

. Calibrate, functional testing, troubleshoot, servicing of

instruments, on Gaslift platforms SSB projects under EPO contract -

Offshore East

Malaysia

. Onshore hook-up of tubing works, loop checking, functional test

instr process and controls system,

fire and gas alarms functions on SSB platforms -

Labuan Shipyard, Sabah. East Malaysia

. Retrofit, servicing and upgrading of instr installations, tubing

hookup offshore SSB platforms on shutdown projects -

Offshore East Malaysia

. Hook-up, functional testing, loop checking of instr loops and

pneumatic control panels on TEK-A GASLIFT Compression platform, SSB

project -

Offshore East Malaysia

. Elect/instr equipment, tray works, supports installations in the

construction of Oil rigs. - Singapore

. Utilities, process piping and associated installation works in hydro-

cracking project. - Indonesia

TRAINING & SEMINARS ATTENDED

. Aug 2010 HSE/ISPS Course

AS Nymo, Eydehavn, Norway

. Apr 2009 COPC - MTS / Permit To Work Compliance

ConocoPhillips, China

. Mar 2009 Bluewater (BES) Permit To Work-Level 2 Compliance

Cresent Aberdeen, Netherlands

. Sep 2008 B.O.S.S & H.U.E.T Offshore Course COOOSO,

China

. Dec 2007 Cultural Awareness Workshop Bluewater

Energy Services BV

. Sep 2005 Electrical Awareness & Safety Course Fluor

Daniel Eastern Div ( USA)

. May 2005 Industry Confined Space Awareness MSTS

Asia Sdn Bhd (M'sia)

. Jun 2000 Clean Room Protocol Level 1~5 Fluor

Daniel International. Malaysia

. Nov 1997 Professional Accident Investigation Course

M.S.O.S.H. (Promet Fabricators )

. May 1995 ISO 9000 Introduction Course

Sembawang Shipyard (S'pore)

. Mar 1993 Petro-Chemical Plant Safety Course Titan

Petro-Chemical

. Dec 1992 Understanding & Implementation of ISO 9000 QMS

Neville Clarke

. Jan 1991 Testing Equipment & Calibration Training

M'sia Shipyard & Engr

. Sep 1988 Swagelok Valves & Tubings Safety Seminar

KL Valves & Fittings

. Apr 1988 Offshore Sea Survivor Training Course Miri

SMTC

. Jun 1985 Shipyard Safety Instruction Course Certificate

Singapore

. July 1981 Shipyard Fire and Safety Watch Course Jurong

Shipyard

. May 1981 Shipyard Apprentice Training Course Jurong

Shipyard Pte Ltd

REFERENCES:

Name : Mr. KC Lim

Position: Construction Manager,

Company: Noble Drilling Services ( USA)

Project: Noble Jim Day DP3 Semi-Submersible Drilling Rig

Location: Jurong Shipyard, Singapore

Period: Dec.2009 ~ June.2010

e-mail: abonno@r.postjobfree.com, abonno@r.postjobfree.com

Name : Mr. Bruno Ban

Position: Commissioning Manager

Company: Bluewater Energy Services ( Netherlands )

Project: FPSO Soft Yoke Mooring Systems. ( Bohai Project Ph.2 )

Location: Chiwan-Sembawang Fabrication Yard, Shekou, Shenzhen. CHINA

Period: Nov.2007~ Sept.2009

e-mail: abonno@r.postjobfree.com, abonno@r.postjobfree.com