Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Hai Phong, Vietnam
Posted:
February 20, 2013

Contact this candidate

Resume:

RESUME

LE VAN DUONG

E-mail add: abofox@r.postjobfree.com

April 15th, 1978.

Birthday:

Citizenship: Vietnamese.

Mobile numbers: + 84.912.269.422.

Address: Luong Quan village, Nam Son commune,

An Duong district, Hai Phong city, Viet Nam.

POSITION APPLIED: + Hull Engineer/ Steel Construction.

+ Shipbuilding/Steel Surveyor/ Field Supervisor.

+ Shipbuilding Technical Coordinator/ Marine Surveyor.

EDUCATIONAL ATTAINMENT:

+ B.A of the Shipbuilding Department at Vietnam Maritime University

(1997 – 2002).

+ Various Training/Seminars (Class office and Painting Company)

+ Shipbuilding Training at the Nakatani shipbuilding Ltd, Co of the Japan

(2005 - 2008).

WORK EXPERIENCE:

+ New Ship Building/ Repair Ship.

+ Conversion Project/ Project Manager

+ Assembly Block/ Erection Block.

+ Blasting/ Painting.

+ Accommodation and Insulation.

+ Steel Bridge Construction.

+ Field Inspection and Supervision.

STEEL SURVEYOR.

:

Position

Inclusive Date : November, 2012 - Current

Company : Damen – SongCam Shipyard Ltd.,Co.

Location : Haiphong Vietnam

Work description:

Responsible inspection for Ship Construction at the shipyard.

-

- Check and recommendation to design department.

- Survey and inspect the implementation of the process of building the

ship flatform.

- Support for other department of shipyard.

Resume: Mr . Duong Page 1

SURFACE TREATMENT MANAGER

:

Position

Inclusive Date : February 2012 - November 2012

Company : MTHojgaard A/S, Denmark.

Project : Rao II Bridge,

Location : Hai Phong city, Viet Nam.

Work Description:

Managed blasting and painting of steel bridge construction base on the

-

schedule and the painting specification by the subcontractor in workshop.

Managed cleaning, touch-up and painting of steel bridge construction base on

-

the schedule and the painting specification by the subcontractor at site.

Managed join to segment with segment of steel bridge construction at site base

-

on specification by the subcontractor.

Erected segment and welded segment on temporary support.

-

Ensure that all installation was in accordance with Class requirements.

-

Works as Technical coordinator for all supplier, technician, engineers and

-

workshop.

: PROJECT MANAGER (Shipbuilder side)

Position

Inclusive Date : 2010 – January 2012

Company : Ben Kien Industry Shipbuilding Ltd., Co.

Location : Hai Phong city, Viet Nam

Project : 16800 m3 Bulk Cement Carries Vessel (The Owner KGJS A/S from

Norway)

Work Description:

- Works as Technical coordinator for all designer, maker, supplier, technician,

and workshop.

- All time I’m controlling the problems relating with project including:

+ The supplies.

+ The financial.

+ The subcontractors.

+ The designs.

+ The quality.

The Most of my clients from Korea, Japan, China, Europe etc.

That why, I should have the opportunity to understand the

practical, culture, their method of working.

VICE MANAGER OF PRODUCTION DEP’T

:

Position

Inclusive date : August 2008 – January 2012

Company : Ben Kien Industry Shipbuilding Ltd., Co.

Location : Hai Phong city, Viet Nam

Work Description;

Direct management and executive produce the exported products

in shipyard.

- Multipurpose vessel: capacity 9200dwt – Exported to the Netherlands (02 sets)

Resume: Mr . Duong Page 2

- Dredge vessel: capacity 2800m3/h – Exported to the Netherlands (01 set).

- Multipurpose vessel: capacity 4600dwt – Exported to the Denmark (02 sets)

- From 2009 – Jan.2012: PM of 16800m3- Cement Carries Vessel exported to the

Norway (02 sets).

I’m always in-charge of all the work related to the preparation and

arrangement all work shop to be done following master schedule and detail

schedule of the all products include:

- Based on the technical specification and requirements from derivative contract

specification from the ship owner and content related to the contract, I set up a

detailed plan for the purchase of materials, design, selection of qualified

contractors meet the requirements of Class’s rules.

- Prepare relating drawings, materials, tools, equipment and working order to all

workshop following the scheduling and Class’s requirements.

- I also combine with safety dept to find good solution during working time make

sure safety before worker go to the fabrication.

- All the problems from designer, supplier I has been discussing with all parties for

finding good solution.

- Management, regulatory division of work instructions and strong requirement for

all staff in the my department make the master plan and detail schedules to

fabrication according to all stage:

+ Steel cutting.

+ Assembling steel panels.

+ Fit up blocks

+ Blasting and painting blocks

+ Erection blocks

+ Full painting before launching

+ Installing all equipment and furniture on board.

+ Installing all piping system on board

+ Testing all equipment following the process on quay

+ Testing all remaining equipment during sea trial.

+ Complete all mistake before delivery to owner.

STEEL SURVEYOR

:

Position

Inclusive date : May 2006 – May 2008

Company : Nakatani Shipbuilding Ltd., Co.

Location : Etajima town, Hiroshima city, Japan.

Work Description:

- I set up a detailed plan for keep the quality for meet the requirements of Class’s

rules.

- Fit up inspection of steel job and piping job.

- Welding inspection after welded.

- Leaking test and function test tanks and piping systems.

- Prepared jobs, documents and contacted to Class for inspection.

Resume: Mr . Duong Page 3

SHIPBUILDING TRAINING AT Q/C DEPARTMENT

:

Position

Inclusive date : May 2005 – April 2006

Company : Nakatani Shipbuilding Ltd., Co.

Location : Etajima town, Hiroshima city, Japan.

Work Description:

Worked at site and QC office of Nakatani shipbuilding.

-

STAFF OF THE PRODUCTION DEPARTMENT

:

Position

Inclusive date : August 2003– April 2005

Company : BenKien Industry Shipbuilding Ltd., Co.

Location : An Hong commune, An Duong district, Hai Phong city, Viet Nam.

Work Description:

Prepared of the condition for shipbuilding process including:

-

+ Steel cutting.

+ Assembling steel panels.

+ Fit up blocks

+ Blasting and painting blocks

+ Erection blocks

+ Full painting before launching

+ Installing all equipment and furniture on board.

+ Complete all mistake before delivery to owner.

Base on the job order from leader I will doing:

-

+ Checked drawing and estimate the material: main material and consumable

material, relating equipment for this the jobs.

+ Recomment to all relating department if something not good for fabrication base

on the building specification and company condition.

+ Make detail schedule for in charging field of the project.

+ Submit to leader the arrange plane, job order following the schedule.

+ Consider and pushing all relating department must be keep fabrication following

schedule and report to the leader.

+ The find down solution for speed up the fabrication and keep the quality, safety.

STAFF OF THE HULL WORKSHOP

:

Position

Inclusive date : June 2002– July 2003

Company : BenKien Industry Shipbuilding Ltd., Co.

Location : An Hong commune, An Duong district, Hai Phong city, Viet Nam.

Work Description:

Prepared of the condition for shipbuilding process after received job order

-

from production department including:

+ Steel cutting.

+ Assembling steel panels.

+ Fit up blocks

+ Erection blocks

+ Complete all mistake before delivery to owner.

Base on the job order from leader I will doing:

-

Resume: Mr . Duong Page 4

+ Checked drawing and received the material: main material and consumable

material, order relating equipment from other department for this the jobs.

+ Arrange the worker and equipment for fabrication following schedule.

+ Submit to workshop manager the arrange plane, solution for saving time and

material.

+ Check and pushing the worker must be keep schedule,quality and safety.

AREA OF STRENGTH:

1. Supervision and management.

2. Conduct Training and seminars.

3. Inspection, maintenance of the field shipbuilding.

4. Fabrication.

PERSONAL DETAILS:

April 15th, 1978

Date of Birth:

Place of Birth: Haiphong City

Citizenship: Vietnamese

Religion: No

Height: 160cm

Weight: 55 kg

abofox@r.postjobfree.com

Email Add:

Mobile number: + 84 912.269.422 Vietnam

Land line: + 84 318.820.359 Vietnam

Home Address: Luong Quan village, Nam Son commune, An Duong district,

Hai Phong city, Viet Nam.

Resume: Mr . Duong Page 5



Contact this candidate