PERSONAL PARTICULARS:
Name: Sayed Mustaffa Kamal Bin Sayed Ali
Age: 51 years old
Contact No: +601*-******* (Malaysia)
+628********** (Indonesia)
Email: abnywx@r.postjobfree.com
Nationality: Malaysian
Marital status: Married
Date of Birth: July 10, 1961
Place of Birth: Pahang, Malaysia
Religion: Islam
Languages: 1. Bahasa Malaysia - Fluent
2. English - Good
3. Bahasa Indonesia - Fluent
ACADEMIC QUALIFICATION:
Tertiary Education: Diploma in Mechanical Engineering - Polytechnic Engku Omar Ipoh, Perak,
Malaysia (1981-1984)
Secondary School:
Higher School Certificate in Mechanical Engineering (Full certificate) -
Secondary Technical School Kuantan, Pahang, Malaysia
COMPUTER SKILLS:
Computer Application: MS Office, Microsoft Word, Microsoft Excel, Outlook
Operating Systems: Windows XP, Windows 2000, Windows 7
OBJECTIVE:
To obtain a position where I can maximize my multilayer of management skills, quality, safety, time
frame and successful track record in oil and gas construction industry.
Site Project/Construction Manager superintendent and supervisor onshore and offshore Process Plant,
petrochemical plant, piping, hook up and Pipelines.
PROJECT PROFILE:
(A) In general:
Site Construction/ Supervision Manager, growing in a major General Contractor Company and client in
Malaysia, Brunei, India and Indonesia for 27 years in construction Projects including Engineering
Procurement and Construction (EPC) company of onshore and offshore pipeline piping petrochemical
plant.
Deep knowledge of quality standards, international specifications, construction activities (hands on)
including pre-commissioning, commissioning, and handover.
Vast experience performed in Oil & Gas fields often in extreme conditions as swampy area underground
utilities with full relationship of local authorities and government bodies.
(B) Competency/Experience:
• Extensive construction and project management experience on EPC Oil & Gas projects
• Proven track record of man-management
• Interface management between services, departments and units
• Experience of managing direct hire, or multi-nationality labor force
• Experience in managing specialist subcontractors, vendors, suppliers.
(C) Outline Job Description:
• Day-to-Day administration and management of construction staff based on sites and marine
activities.
• HSE Coordination, procedure revision and reporting.
• Hands on management of the construction plan and activities.
• Coordination of field engineering, procurement, construction.
• Overseeing the commercial and technical management of sub-contractors and liaising with the
client's technical and commercial representatives.
• Performing presentations to Directors, Client, subcontractors, construction staff personnel and labour
force.
• Producing progress reports.
• Coordinate Quality Assurance/Quality Control office and site teams.
• Managing contractual changes, field engineering modification, claims.
(D) Client/Operator history
1. October 2011 – present: Company authorized representative with PERTAMINA, Offshore
Construction, Jakarta, Indonesia;
2. Feb 2011 until October 2011: Site Representative for Brown Field Project with EXXON
MOBIL Kuala Lumpur, Malaysia;
3. 2008 until 2009: Client Site Representative-for pipeline installation and shore approach with
MURPHY OIL CORPORATION, Bintulu, Malaysia
4. Nov 2009 to March 2010: Client Site Representative for pipe line installation anchor pile pilling
PLEM installation SPM installation and shore approach with HINDUSTAN PETROLEUM
COMPANY LIMITED, Visakapatnam, Andra Pradesh, India
5. Feb 2007 until June 2007: Client Site Representative for pipeline installation anchor pile piling SPM
installation and shore approach with BHARAT PETROLEUM LIMITED, Kochi, Kerala, India
6. Sept 2006 until Feb 2007: Client Representative for pipe line installation with EXXON MOBIL,
Kuala Lumpur, Malaysia
7. 2003 until 2004: Client Site Representative for top site major maintenance with PETRONAS
CARIGALI, Miri, Sarawak, Malaysia.
•
8. February 2003 until August 2003: Construction supervisor for Tapis F host tie in @Tapis A with
Exxonmobil Malaysia
9. April 2002 until January 2003 : construction supervisor for Cakerawal platform hook up and
commissioning with Carigali Hess formerly known as Carigali Triton Operating Company(CTOC)
WORKING SUMMARY/WORKING EXPERIENCES:
1. 15 Oct 2011- present:
Position: Construction Barge Superintendent/Company Authorized Representative
Company/Country: Pertamina, Jakarta, Indonesia
Project: For platform refurbishment-deck extension, fabrication, turn around
replace new boat landing pipeline repaired replace new fin fan cooler
deck extension and construction services
Total construction crew 165 pax
Contract duration until end of May 2012
Work Barge - AWB Kaspadu 1
2. Feb 2011 - 30 Sept 2011:
Position: Construction Supervisor/Site Representative
Company/Country: Exxon Mobil Malaysia
Project: Brown Field Project (piping & structural).
Fabricate 2 numbers launcher & receiver
Fabricate associate piping
3. July 2010- Aug 2010:
Position: Marine Warranty Surveyor
Company/Country: Noble Denton Malaysia Sdn Bhd, Malaysia
Project: 24” Riser Installation for Tangga Barat Drilling Platform to
Resak Drilling Platform
Work Barge: DLB 264
*This job I replace the regular MWS due to that personnel taking emergency leave
4. Apr 2010 - 28 June, 2010:
Position: Offshore Construction Superintendent
Company/Country: PBJV Group Sdn Bhd, Malaysia
Project: 28"diameter Shore Approach Pipeline for Kumang Cluster Development
(Petronas)
Beach Pull, Pipe Lay for 6.7KM
Total joint 504 joints
Work Barge: PLB Faulkner
5. Nov, 2009-15 Mar, 2010:
Position: Offshore Construction Superintendent/Client Representative
Company/Country: Hindustan Petroleum Corporation Ltd India, India
Project: Anchor piling for SPM and PLEM installation shore approach pipe lay
Location: Visakhapatnam India
Work barge: Leighton Mynx an Stealth
6. Apr, 2008 - Feb, 2009:
Position: Construction Superintendent cum Company Site Representative
Company/Country: Murphy Oil Corporation, Bintulu, Sarawak, Malaysia
Project: Hybrid Rentis Pipeline Installation For Sk-309/311 Phase 1 Gas
Development Project-Beach Pull For 2 Lines 24 Inch Pipe Line
Work barge: Swiber Qonquest
•
•
7. Nov, 2007 - Mar, 2008:
Position: Offshore Construction Manager
Company/Country: Mushtari Sdn Bhd, Malaysia
Project: Shut Down, Construction and Hook Up and Commissioning For
Cakerawala Platform
•
• Work Barge: Jascon 28
•
•
8. Apr, 2007 - Oct, 2007:
Position: Construction and System Integrated Testing Coordinator
Company/Country: Helix Energy Solution, Kencana Fabrication Yard, Malaysia
Project: Deep Water Structure Fabrication-Kg D6.
Fabricate 6 Modules PLEM, 11 Suction Piles
Flushing and Hydro Testing
9. Sept, 2006 - Mar, 2007:
Position: Construction Superintendent cum Company Site Representative
Company/Country: Bharat Petroleum Corporation Ltd, India
Project: Single Point Mooring project, shore approach and 48 Inch Offshore
Pipeline Installation-total lengths 20 KM
Location: Kochi, Kerala, India
Work barge: Leighton Stealth
10. Jun, 2006 - Sept, 2006:
Position: Construction Supervisor cum Client Representative
Company/Country: Exxon Mobil, Malaysia
Project: 28” and 16”Tabu A to Guntong E pipeline Installation-7.1 km total 576
joints and riser installation
Work barge:DLB264
•
11. 2005- May, 2006:
Position: Construction Supervisor
Company/Country: SKS Wood Sdn Bhd, Brunei Darussalam
Project: Ampa Fairley,and Champion field –rejuvenation construction services
and pipeline replacement
Work boat/barge: Armada Iman and Lewek Conqueror
12. 2005:
Position: General Construction Superintendent
Company/Country: Vastalux Sdn Bhd, Malaysia
Project: Petronas Carigali Sarawak, Pipe line Replacement at Miri Crude Oil
Terminal (Onshore). To change new 16”receiver and associated piping
and valves
13. 2004 - 2005:
Position: Construction Superintendent
Company/Country: Petra Resources Sdn Bhd, Malaysia
Project: Sarawak Shell Berhad/Sabah Petroleum Company Limited for Hook-Up
and Commissioning, Construction Services and top side major
maintenance.
Work barge: Petra Challenger, Discovery and Emerald
14. 2003 - 2004:
Position: Company Site Representative
Company/Country: Petronas Carigali, Miri, Sarawak, Malaysia
Project: Top Site Major Maintenance-Blasting Painting and Mechanical Piping.
Work Boat-Armada Goodman-65 Construction Crews Witness / monitor
hydrostatic and other testing.
•
•
•
15. Feb, 2003- Aug, 2003:
Position: Construction Supervisor
Company/Country: Exxon Mobil, Terengganu Offshore, Malaysia
Project: Tapis F host tie in @Tapis A
•
•
•
•
16. Apr 2002 - Jan, 2003:
Position: Construction Supervisor
Company/Country: Carigali Triton Operating Company (CTOC), Malaysia
Project: Hook-Up & Commissioning for Cakerawala Field.
Work barge: Sarku 2000
17. 2001 - 2002:
Position: General supervisor
• Company/Country: Dayang Enterprise Sdn Bhd, Malaysia
•
Project: Offshore Topside maintenance and construction.
•
•
•
18. 2000 – 2001:
Position: Piping Supervisor
Company/Country: Samsung Engineering, Terengganu Malaysia
Project: Malaysia Olefins Project- Petronas & Union Carbide
19. 1999 - 2000:
Position: Piping Supervisor
Company/Country: Projass Engineering Sdn Bhd, Terengganu, Malaysia
Project: Resak Onshore Gas Terminal Project-Pipe lay(48”and 16”) and road
crossing (pipe jacking) for Petronas Carigali.
•
•
•
20. 1998 - 1999:
Position: Piping Supervisor
Company/Country: Nam Fatt Energy Sdn Bhd, Terengganu, Malaysia
Project: Underground and aboveground piping work at Kerteh Vinyl Chloride
Monomer Project, Kerteh – PETRONAS gas
21. 1996 - 1998:
Position: Pipe Line Foreman
Company/Country: Mc Connel Dowell, Terengganu, Malaysia
Project: GPP 5 & GPP 6 Project, Paka, Terengganu –Road Crossing and Pipe
Jacking and pipeline installation (48”) for Petronas Gas
22. 1992-1995:
Position: Construction/Piping Supervisor
Company/Country: Sime Sembawang Engineering Fabrication Yard, Pasir Gudang, Johor,
Malaysia
Project: Top Side Fabrication for Petronas.
23. 1988-1992:
Position: Construction/Piping Supervisor
Company/Country: Malaysia Shipyard and Engineering Fabrication Yard, Pasir Gudang,
Johor, Malaysia
Project: Top Side Fabrication for Sarawak Shell
24. 1985-1988:
Position: Offshore Maintenance
Company/Country: Haji Malai Mahshor, Brunei Darussalam
Project: Top Side Maintenance for Ampa & Champion Field for Brunei Shell
Petroleum
SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES:
• Medical Check Up/Report will expire on June 2013
• Radiography Interpretation(RI)level 2
• Welding Inspector 3.1
• Sea Survival Course (Mboset) will expire on 13 September 2015
• PTW (Permit To Work) Conduct by Sarawak Shell Berhad
• H2S (Hydrogen Sulphide Awareness)
• Damage Control Team course at UNOCAL 76 Thailand.
• Exxon Mobil fundamental of safety training - 4 days
• Risk Assessment level 2 training by Exxon Mobil - 2 days
• First Line Supervisor training by Exxon Mobil - 2days
• SHE training by Exxon Mobil - 2 days
• Occupational and health course by ExxonMobil -1 day
• Management of Change course by Exxon Mobil - 2 days
• Competency Assurance System by ExxonMobil - 2 days
• Work management training by Exxon Mobil - 1day
• SSOW Performing Authority Training by Pertamina Indonesia - 2 days
• Area authority training by Pertamina - 3 days theory and 1 day on site practical
(This training capture PTW preparation Isolation Conformation Cert, isolation point base on P&ID)
REFERENCES:
1. Mr. P Sri Kumar
Project Manager Intec SEA engineering Sdn Bhd Kuala Lumpur
Contact Number: +601********
2. Mr Zahimi Osman
Project director Sapura Sdn Bhd
Contact Number: +601********/601********