abnym3@r.postjobfree.com
Newburgh, Indiana
47630
Phone 812-***-****
Ronald Backner
Sterling Boiler Mechanical Contractors
Work Evansville, Indiana 47715
Experien
ce March, 2011 to June, 2011
Field Engineer
Four month contract for project at Duke Energy, Edwardsport,
Indiana.
Responsibilities:
Verify piping and pipe supports are installed per drawings;
Create punch list of errors and omissions;
Generate piping;
Turn over packages and hydro packages;
Generate red line drawings as required;
Assure all punch list items are updates to agree with drawings.
June, 2010 to July, 2010
Piping Estimator
One month contract for take-off for multi-million dollar power
plant retro-fit.
R.T. Patterson Company
6500 Interchange Road South
Evansville, Indiana 47715
December 1989 to February 2010
Senior Piping Designer
As a Senior Piping Designer, my responsibilities include, but are
not limited to the following:
Estimate Engineering cost of various piping projects for the
aluminum, steel, chemical and power industries. Write engineering
scope of work.
Manage piping department to maintain highest degree of
professionalism.
Assign work and set schedules.
Coordinate projects with other disciplines, which are related to
project.
Establish and maintain client relations.
Generate Flow Diagrams and P & I D's as required by design or
client.
Perform field investigations as required to assure accuracy and
correctness of design drawings.
Generate orthographic and isometric drawings as required, either
manually or by CAD using Release 14
and 2007.
Check piping drawings and perform thermal calculations where
required.
Train new personnel entering the piping department.
Generate foundation designs and detail drawings.
Generate structural designs and detail drawings.
Generate mechanical designs and detail drawings.
Generate ductwork designs and detail drawings.
L.K. Comstock Company
4900 Shamrock Drive
Evansville, Indiana 47715
June 1984 - December 1989
Senior Piping Designer
As a Senior Piping Designer, my responsibilities were same as
noted above for my current employment.
L.K. Comstock Company
Midland, Michigan
August 1981 - June 1984
Checking Department Manager - Midland Nuclear Power Plant
As a Checking Department Manager, my duties included, but were
not limited to:
Schedule Work assignments for approximately twenty-five (25)
employees.
Perform quality control checks of isometric packages generated by
the checking department.
Check instrumentation isometrics to assure thermal and seismic
criteria were met and routing was correct when necessary to
achieve target date.
Head Trainer - Midland Nuclear Power Plant
As a Head trainer, I was responsible for training new instructors
and engineering personnel the rules and regulations as set forth
by the Nuclear Regulatory Commission.
L.K. Comstock Company
Pittsburgh, Pennsylvania
April 1973 - August 1981
Lead Piping Designer
As a Lead Piping Designer, my duties included, but were not
limited to, the following duties:
Estimate Engineering cost of various piping projects for the
aluminum, steel, chemical and power industries. Write engineering
scope of work.
Manage piping department to maintain highest degree of
professionalism.
Assign work and set schedules.
Coordinate projects with other disciplines, which are related to
project.
Establish and maintain client relations.
Generate Flow Diagrams and P & I D's as required by design or
client.
Perform field investigations as required to assure accuracy and
correctness of design drawings.
Generate orthographic and isometric drawings as required.
Check piping drawings and perform thermal calculations where
required.
Train new personnel entering the piping department.
Generate ductwork designs and detail drawings.
Allstate Design and Development
Pittsburgh, Pennsylvania
1972 - 1973
Piping Designer
As a Piping Designer, my duties included, but were not limited
to, design pipe routings by writing computer programs utilizing
keypunch operator to generate orthographic and isometric drawing
for Allied Chemical Company.
Blawnox
Pittsburgh, Pennsylvania
1971 - 1972
Piping Checker
As a Piping Designer, my duties included, but were not limited
to, check piping isometrics against
Plant model and P. & I.D.'s.
Schneider Engineering
Pittsburgh, Pennsylvania
1970 - 1971
Field Engineering
Project - Beaver Valley Nuclear Power Plant - Unit 2
Duties - Generate small-bore Non-Q isometrics. Locate high point
vents and low point drains. Field verify pipe routings before
fabrication and installation.
Bechtel Engineering
Gaithersburg, Maryland
1969 - 1970
Piping Draftsman
Project - Millestone Nuclear Power Plant
Duties - Perform work assigned which included routing of piping
from pumps to users. Size and route ductwork to various areas of
the power plant.
Educatio Educational Institute of Pittsburgh
n
Canon McMillan Senior High School
General /Academic
Military 1964 - 1967 United States Navy Honorable
Service Discharge
Duties included the operation and maintenance of all power
generating equipment in main and
Auxiliary engine rooms.