. The client had little knowledge of the available chilled water to feed
its' leading edge data centers. As a result I developed a data base
of the capacity and loading of 25 buildings within the government
campus. This greatly improved the speed and accuracy of customers
request to tap into the mechanical infrastructure.
. Provided Facility Planning for my client to manage, plan, justify, and
budget their capital projects looking 5 years out.
. Worked with my client to develop and manage a 100-page set of design
drawings which included remodeling an existing space for new
requirements. This included the management of scope, schedule, and
cost of sub-consultants, as well as internal groups such as
structural, electrical, and CAD.
. Worked with my client to develop and manage a set of design drawings
to remodel a kitchen/cafeteria. I was the team lead coordinating a
kitchen and architectural sub-consultants as well as internal groups,
such as structural, civil, electrical, and CAD.
. Our client had a concern in their medical facility as far as
containing germs and their waste streams and desired to bring the
facility up to industry wide standards. My study provided 3 options
for my client. Upon choosing an option and construction, the medical
center is better able to handle large outbreaks within the government
campus.
. Reviewed shop drawings and submittals during the QA/QC process. This
kept the design process moving forward and minimized the costs and
schedule overruns.
Senior Mechanical Engineer Feb. 2005 - May 2006
Alliance Engineering
. Design and specification development for clients in the
manufacturing industry.
. Developed plant modifications for a 1.2 million square foot
facility, to take the facility well into the future, to support their
needs and keep them on the competitive edge.
. Integrated HVAC and Piping Process Systems into the operations.
. Updated the main infrastructure while keeping the plant
operational.
. Designed the plant wide Condenser Water System, including
cooling towers and plate and frame heat exchangers.
. Worked with my design team, contractor, owner, maintenance, and
production to develop new engine testing cells.
. Provided several utilities, including a temperature sensitive
combustion air AHU, an integrated diesel exhaust system, cooling water
for the engines, and water for a water-powered dynameters.
. Produced drawings for both waterside and airside HVAC and
Processes.
. Continuously streamlined processes with coordination at the
field level to ensure for smooth transitions.
Southland Industries November, 2004
HVAC Designer
. As a contractor I stayed for short period before realizing it was not a
good fit for me or Southland Industries.
HVAC Design Engineer
Valco Engineers June 2004 - July 2004
. Worked as a contractor of Oxford Technical on the redesign of
floor space in an educational environment.
. Accomplished field work to verify existing conditions.
. Designed HVAC system for a photo lab, computer lab, classroom,
and office spaces.
Project Engineer III
Fedex Ground Sept. 1999 - Jan. 2004
. Directed the overall scope of work, budget, and schedule for
numerous capital projects in the Material Handling Industry, including
PLC based systems.
. Planned, Directed and Implemented multiple projects with a total
budget of $15MM.
. Ability to coordinate and direct multi-functional groups with
minimal supervision.
. Sequenced the activities involved to develop an overall
schedule.
. Communicated with my clients throughout the projects to ensure
their input was integrated into the project.
. Wrote Expenditure Proposals to justify the project from a
business perspective.
. Submitted General Arrangement Drawings and specifications to
several vendors for the bidding process.
. Assisted in the consultation to decide which vendor would be
awarded the contract.
. Effectively communicated to multi-functional team members to
manage changes throughout the process.
. Managed the design procurement, fabrication, integration and
construction of the Material Handling system, to deliver the
Operations team with many successful projects.
. Ensured that the O&M manuals and spare parts were on site for
start-up.
. Developed a final punch list for my vendor to complete their
contract requirements.
. Assisted and coordinated the testing, troubleshooting, training,
and start-up support.
. Managed project correspondence, and administer payments when
defined milestone were completed.
. Ensured that the As-Built drawings were delivered and accurate.
HVAC Mechanical Designer
LLI Technologies May 1995 - Sept. 1999
. Created contract drawings and specifications for bidding and
construction of renovated and new commercial facilities.
. Conducted field surveys of existing facilities, which was then
used to conceptualize new designs.
. Design of HVAC systems, which included duct sizing and layout,
friction loss calculations, heating and cooling load calculations.
. Design of HVAC equipment from boilers, chillers, air handling
units, condensing units, cooling towers, pumps, ductwork, and
primary/secondary piping systems using VFD applications.
. Designed hot water, chilled water, condenser water,
refrigeration, steam, compressed air, and natural gas piping systems.
. Coordinated construction drawings and specifications within
multi-disciplines, to minimize the problems in the field.
. Experience with application and specification of Plumbing and
Fire Protection Equipment and applicable NFPA and BOCA codes.
. Oversaw projects that involve critical electronic equipment and
processes for the telecommunications industry.
. Managed vendor submittals and shop drawings for HVAC, Plumbing,
and Fire Protection equipment.
Facility Manager
Novum Incorporated Jan. 1994 - May 1995
. Maintained a 60,000 square foot facility
. Supervised maintenance personnel and developed weekly scheduling
and procedures.
. Directly accountable to the president for maintaining all
mechanical aspects of the facility.
. Managed the operation and performance of HVAC equipment.
. Coordinated with outside contractors, as required.
Custodian
University of Pittsburgh, Facilities Management Department Jan. 1979 -
Dec. 1993
. Maintained facilities throughout the University.
. Reported issues in the buildings that needed attention of other trades.
. Transitioned to other functions within Facilities, such as the Movers,
and Grounds Crew.
Education and Licensure
PE License - Commonwealth of Pennsylvania, State of Maryland
B.S., Mechanical Engineering, University of Pittsburgh, 1993
CLEARANCE: TS/SCI (full scope)
Computer Skills: MS Project, Excel, and Word, Outlook, Autocad 2005