James K. Clark
Bradenton, FL 34205
941-***-**** (cell) / 941-***-****(hm)
abn6uo@r.postjobfree.com
OBJECTIVE Safety first and production.
I have a Valid Passport, TWIC expiration March 9, 2016, CCO September 30, 2016, NCCCO #110969705 Designations: LBC, LBT, TLL
OSHA 10 & 30 hour courses taken, DOT Medical Card PA9104409-FL exp. June 6,2013
EXPERIENCE –
PCL/ Archer Western
I-4 Connector Tampa, FL – Crane Operator .2250 Manitowoc 2011 - Current
Flatiron Constructors. Inc. - 2006 – Job completion 9 / 2010
Foreman/Operator; John's Pass Bascule Bridge Replacement, Madeira Beach, FL 33708
Demolition and Reconstruction of existing bridge structure to include but not limited to Supervision of Crew, Trestle Installation, Pile Driving, Drill Shafts & Heavy Equipment Operator – 4100 Ringer, 4100 Series II, 4000 Manitowoc, 888 Manitowoc, a variety of Americans; ranging from 5299-9320 and Hydro Cranes.
Misener Marine Construction, Inc. 2003 - 2006
Operator; Thomas B. Manual Bridge Project, Stuart, FL
A main contributor in the Rehabilitation of a four lane highway bridge on the Florida Turnpike, including Demolition and Reconstruction of the Superstructure.
Operator; Port of Tampa, Maintenance Dredging, Tampa, FL
Balfour Beattv Construction, Inc. 2000 - 2003
Operator/Foreman; SC 170 Widening Bridge Project, Beaufort, SC
Contributor in all phases of a four lane bridge, including Drilled Shaft Substructure, Columns, Pier Caps, Girder Erection and Post tensioned Superstructure Deck.
Atlantic Maine construction Co., Inc. 1997 - 2000
Crane Operator/Pile Driver/Carpenter; Residential Dock & Seawall Construction
Construction of Docks & Seawall structures including Demolition, Pile Installation, Headers, Stringers, Decking & Handrails as well as Seawall Bulkhead Piling.
The Industrial Company (T.I.C.) 1996-1997
Pile Driver; Berth 7 Improvements, Port of Savannah, Savannah, GA
Constructed Bulkhead systems, Pile Driving both Plumb & Battered.
Hardaway Construction Company 1992-1996
Pile Driver/Carpenter; Parris Island Bridge, Beaufort, SC
Completed all phases of construction on a multi lane bridge. Pile Driving, Cofferdam Construction, Formwork, Columns, Caps, Girder Erection & Structural Steel & Bridge Deck.
REFERENCES –
Todd Cook, Superintendent – PCL/ Archer Western 813-***-****
Ronald Batson, Crane Operator - Flatiron Constructors, Inc. 727-***-****
Jeff VanEpps, Crane Operator - Flatiron Constructors, Inc 727-***-****
Steve Pitts, Superintendent – PCL/Archer Western 561-***-****