RALPH L HENSKI
*** ***** *** - *********, ** ****6
567-***-**** (cell) E-mail: abmsup@r.postjobfree.com
EDUCATION
M.B.A. Business Admin (approx 30% cmp) Ashland University
Ashland, OH
B.S. Business Administration Urbana University
Urbana, OH
A.A.S. Industrial Engineering Mgt Edison State College
Piqua, OH
CERTIFICATIONS
Six Sigma Green Belt
Certified LEAN/DFSS
PROFESSIONAL EXPERIENCE
Medalist Laserfab, Inc, Oshkosh, WI $22M Sales Multi-Plant
Operation 2008 to 2009
Director of Manufacturing Operations
Metal Fabrication-Contract Manufacturing-DoD, Automotive, Railroad
Industries
Successfully managed and directed turn-around situation of a business
experiencing very low on-time delivery and supplier ratings, 100+ direct
labor personnel in three (3) facilities P&L and budgetary responsibility of
plants, directed and managed manufacturing and support functions of
purchasing (2), engineering (4), production scheduling (1), inventory
control (4), shipping and receiving (5).
Accomplishments & Improvements:
*On-Time Delivery from 74 to 98% *Raw Inventory 65% Reduction
*Supplier Rating from 56% to 98%
*Labor Reduction Weld 38% *WIP 10 Days to 2 Day Avg *Productivity
54% to 88% Press Brake
Project Management Accomplishments:
Capital Equipment: (2) Robotic Weld Cells, New fixtures for Weld Cells
Building: New Roof Membrane, Parking Lot Upgrade
Continuous Improvement: 5S, Work Instructions, Preventive Maintenance
Program, OEE Measure, Shop Safety Committee Implementation
Processes/Equipment: Sheet Metal and Structural Metal Fabrication, Laser,
Turret Press, Press Brake, Tube Cutting, Tube Bending, Robotic & Manual
Welding; CNC & Manual Machining
Collins Industries Inc 2003 to 2008
Director of Operations, Mid Bus, Inc, Bluffton, OH $32M Sales
Manufacture of Type A School & Activity and Specialty Buses-
Automotive/Government/Specialty Vehicle
Successfully managed and directed turn-around situation of plant with
negative gross margin, EPA fines and issues, OSHA related issues, with
increasing warranty costs, lack of quality and poor delivery performance.
Responsible for Manufacturing Operations, Engineering,
Materials/Purchasing, HR, Quality, Shipping, Receiving and Stockroom
comprising of 14 salaried/indirect and 150+ hourly in a 3-shift operation,
180,000 sf ft facility. Managed P&L, budget, EPA and OSHA Safety compliance
and reporting for facility.
Accomplishments & Improvements:
*5.2% operating loss to a 10.9% operating profit *Leadtime
reduction 27 days to 11 days
*Reduced percent of labor per unit by 22% *Reduce manufacturing
area from 180K to 120K
*Increased inventory turns from 3 to 17 *Reduced OSHA recordable
injuries from 23 to 2
*Lost days from 25 to 0 *Instituted technology
based plan in Primary
*Reduce warranty costs by 46% in 2005 reducing labor by
+50%
45% in 2006, and 53% in 2007 *IPV(Incidents Per Vehicle)
2004=3.03, *Reduced Hazardous waste streams from 15 to 3 2005=1.80,
2006=.76, 2007=.35
Project Management Accomplishments:
Capital Equipment: Robotic Weld Cell, Semi-Automated Roof Weld Fixture,
Floor Weld Fixture, Body Assembly Fixture, Paint Booth & Oven, Plural
Paint System
Building: New Roof Membrane, Factory Office Renovation, Factory Lighting,
Plant Layout
Continuous Improvement: Lead LEAN implementation, including training staff
and employees in lean tools including 5S+1, kanban, waste identification
and elimination, SMED, VSM and problem solving techniques. Implemented PM
Program, OEE Measures, Reduced Hazardous Waste Streams from 15 to 3
Processes/Equipment: Sheet Metal and Structural Metal Fabrication, Plasma
Cutting, Turret Press, Press Brake, Robotic & Manual Welding; CNC & Manual
Machining; Paint; Wire, Cable & Harness Assembly; Seat/Upholstery;
Assembly
Continue- Collins Industries Inc
Plant Manager, Wheeled Coach, Inc, Hutchinson, KS, $65M Sales
Multi-Building Operation
Manufacture of Custom and Standard Ambulance and Rescue Vehicles-
Automotive/Specialty Vehicle/DOD
Lead a successful turn-around situation for satellite facility with
negative gross margin, severely behind schedule, poor quality with
increased warranty costs. Responsible for leading and directing
Manufacturing Operations, Engineering, Materials/Purchasing, HR, Quality,
Shipping, Receiving and Stockroom comprising of 18 salaried/indirect and
180+ hourly in a 1-shift operation, in a campus setting of seven (7)
different building totaling 240,000 sqft. Managed P&L, budget, PA and OSHA
compliance and reporting for facility.
Accomplishments & Improvements:
*2.9% operating loss to a 8.3% operating profit *Reduced percent
of labor by 26%
*Reduced past due units from 33 to 3 in 6 months *Achieved a 96% on-time
delivery rate
*Leadtime reductions from 35 to 21 days MODs *Leadtime reduction from
21 to 11 days for Vans
*Inventory turns from 6 to 14 *Reduced warranty claims
cost in 2003 by 58% *IVP(Incidents Per Vehicle) 2002=2.91,
and 46% in 2004
2003=1.08, 2004=.47
Project Management Accomplishments:
Capital Equipment: CNC Wood Router, Omal Doweling Machine, CNC Edge
Banding, Lamination Press, Plural Paint System, Fiberglass Molds
Building: Factory Office Renovation, Factory Lighting, Facilities/Plant
Layout
Continuous Improvement: LEAN implementation, including training in lean
tools including 5S+1, kanban, waste identification and elimination, SMED,
VSM and problem solving techniques, PM Program
Processes/Equipment: Sheet Metal and Structural Metal Fabrication, Plasma
Cutting, Turret Press, Press Brake, Manual Welding; CNC & Manual Machining;
Cabinet Making; Paint; Wire, Cable & Harness Assembly; Upholstery; Assembly
PECO II, Inc, Galion, OH $240M Sales 1999 to 2003
Director Advanced Manufacturing/General Manager Support Business Unit
Manufacture of Power and Distribution Equipment for Telecommunications
Industry
Manage and direct with P&L and budgetary responsibility of Support
Business Unit consisting of 350 plus hourly and 30 salaried/indirect
employees in a 480,000 sq ft facility including Manufacturing Operations,
Design Engineering, Manufacturing and Industrial Engineering, Purchasing,
and Material Control within SBU.
Accomplishments & Improvements:
*Exceed Operating Profit 2 of 3 years *Increased Overall Inventory
turns from 3 to 16
*Cabinet Leadtime from 10 days to 3 days *Direct Labor Reduction
Bus Bar Fabrication 58%
*Reduced Internal Fabrication Rejects by 73% *Reduced Raw Fabrication
Inventory 65%
*Reduced WIP 75% in Harness Department *Reduced WIP 83% in
Fabrication
*Reduced WIP 62% in PCB *Setup Reduction Bus Bar
Fabrication 84%
Project Management Accomplishments:
Capital Equipment: EHRT CNC Punch, EHRT CNC Bender, RAS Folding Machining,
Hass VMC, Komax Cable Machine, Eubanks Automatic Wire Processor, CableScan
Harness Boards/Fixtures, Bobbin Winding Equipment, Material Handling
Equipment, Wave Solder System, Aqueous Cleaner, Pad Printer
Building: New 280K sq ft facility, Factory Office Renovation, Factory
Lighting Old Building, Facilities Layout
Continuous Improvement: Training and implementation of LEAN tools
including 5S, kanban, waste identification and elimination, SMED, VSM and
problem solving techniques, OEE measurements
Processes/Equipment: Sheet Metal and Structural Metal Fabrication, Laser,
Press Brake, Welding, Powder Coat; CNC & Manual Machining; Wire, Cable &
Harness Assembly; Transformer and Chock Assembly; PCB; Assembly
Amphenol Interconnect Products Corp, Columbus, OH $5M Sales 1999 to 1999
Plant Manager: Contract Manufacture of Communication and Power Cables and
Wire Harnesses
Successfully lead a start-up satellite manufacturing operation.
Established manufacturing infrastructure; exceeded quality and delivery
goals. Full P&L and budgetary responsibility of plant, directed and
managed Human Resources, manufacturing, purchasing, quality, inventory
control and customer service. Organized, trained and lead the plant on
LEAN.
Processes/Equipment: Wire and Cable (cnc & manual cut, peel, terminate);
Harness Assembly.
Angell Mfg Co, Dayton, OH $12M Sales 1997 to 1999
Plant Manager: Manufacture of Decorative Overlays and Stampings-Automotive
and Appliance Industry
Successfully directed and managed the performance of a union facility in a
turn-around situation. Implemented Lean manufacturing techniques 5S,
kanban, SMED, visual management throughout plant. Managed and conducted
grievance process and member of contract negotiation team.
Project Management Accomplishments:
Capital Equipment: (2) Automatic Stack/Sort Equipment, UV Cure Oven, Semi-
automated Laminator, Clam Shell Press, Emulsion Application Equipment,
Semi-automated Screen Cleaning System
Building: Facilities Layout
Continuous Improvement: Training and implementation of LEAN tools
including 5S, kanban, waste identification and elimination, SMED problem
solving techniques
Processes/Equipment: Semi-automatic and Manual Printing-1st and 2nd
Surface (Solvent & UV Inks); Screen Making; Ink Mixing; Color Matching;
Forming; Laminating; Stamping Presses; Clam Shell Press; Assembly.
Hobart Bros Co, Troy, OH $350M Sales Multi-facility Operations (3)
1989 to 1996
Manufacture of Welding Equipment, Industrial Battery Charges and Airport
Ground Power Equipment-Capital Equipment/DoD/Aerospace Industry-
Manufacturing Group Manager: Manage and direct Machining, Tool Shop,
Metal Fabrication, Paint, Stamping, Gun Assembly, Transformer Assembly,
Electronics, Wire/Cable and Harness Assembly Departments, up to 450
employees, 14 supervisors and leads.
Manufacturing Engineering Supervisor : Manage Manufacturing Engineering
Department, 4 Manufacturing/Industrial Engineers. Core team member of
AS400 MAPICS MRP implementation.
Lead LEAN in the following areas PWB assembly, machine shop, fabrication
department, wire and cable fabrication, harness assembly, gun assembly,
transformer assembly and stator assembly areas. Implemented cellular
manufacturing, kanban, 5S, SMED, visual management, Poka-Yoke, and problem
solving.
Project Management Accomplishments:
Capital Equipment: FinnPower Turret/RT Angle Shear FMS, Cincinnati Laser,
Motoman Robotic Welding Cell, Cincinnati 4" Press Brake, (2) Hager
Presses, (2) Nordson Powder Coat Booths, 6 Stage Wash/Treatment System,
Traub CNC Turning Center, Toyoda VMC, (2) Mills, Davenport Screw Machine,
Minster Punch Press, Durant Feeded/Straightener, CHAD Industries Odd Form
Insertion Machine, Universal 140 Station Insertion Machine, Eubanks Wire
Processing Equipment
Building: Facilities Layout, Facilities Consolidation
Continuous Improvement: Training and implementation of LEAN tools
including cellular manufacturing, 5S, kanban, waste identification and
elimination, SMED
Processes/Equipment: Sheet Metal and Structural Metal Fabrication, Laser,
Turret Press, Press Brake, Stamping Presses, Tube Cutting, Tube Bending,
Robotic and Manual Welding, CNC & Manual Machining; Powder Coating; Wire,
Cable & Harness Assembly; Transformer and Chock Assembly; PCB Assembly;
Assembly.
Aerovent Inc, Piqua, OH $175M Sales Multi-facility
Operations (2) 1985 to 1989
Industrial Engineering Supervisor
Manufacture of Industrial Material and Air Moving Equipment-HVAC/Capital
Equipment/Construction Industry
Manage Industrial Engineering Department, responsible for two (2)
facilities, Core team member for AS400 DATA3 MRP implementation. Two (2)
Industrial Engineers, Three (3) IE Technicians. Activities included
development and implementation of mfg cells, visual management boards,
kanban, Poka-Yoke and SMED.
Processes/Equipment: Sheet Metal and Structural Metal Fabrication,
Welding, CNC & Manual Machining; Paint and Prep; Wire and Cable & Harness
Assembly; Assembly.
USAF 1978 to 1985
E-5- Management Engineering-Manpower Management Technician : Conduct SAC
and Air Force Management Engineering Agency directed studies at base
level. Prepare and coordinate manpower standards development reports and
manpower standards application project for a duel-wing installation.
Provide management advisory and consultant services to wing and
subordinate unit commanders and managers.
Medical Service Technician: Assist professional medical staff in the
treatment of patients in the Medical/Surgical Ward, Emergency Room and
various clinics
Key Words:
Automotive, Aerospace, Defense, Military, Specialty Vehicle,
Telecommunication, Power Generation, Capital Equipment, HVAC, Appliance,
Certified Lean/DFSS, Six Sigma Green Belt, DMAIC, Value Stream Mapping,
Cellular Manufacturing, Kaizen, Kanban, 5S, SMED, 5 Whys, Employee
Relations, Profit & Loss, Revenue Growth, Value Stream Mapping, Project
Management, Change Management, Multiple Facility, Expansion, Strategic
Planning, Tactical Planning, ERP, MRP, ISO9000, QS9000, Safety, OSHA,
Environmental, EPA, Turn-around Management, Quality Improvement,
Manufacturing Engineering, Industrial Engineering, CNC Machining, Manual
Machining, Metal Fabrication, Stamping, Welding, Fiberglass, Wet Paint,
Powder Coating, Printed Circuit Board, Wire & Cable, Harness Assembly,
Custom Assembly, High Volume Assembly, Printing, Cabinet Making, Coil
Winding, Transformer Assembly, Armature, Stator, MBA, BS