AWAIS UL HAQ
Permanent Address: Phone: 92-345-*******
MirzaFazalHaq, Street # 1, Email: abmih5@r.postjobfree.com
NIC #: 34201-6519271-3
House # 4, Usmanpura near railway station
House
Gujrat, Pakistan PP # :AP6329711
OBJECTIVES
A challenging career within a dynamic and progressive organization where enthusiasm, dedication
and ability to manage tasks are prerequisite in driving the organization forward.
EDUCATION
2012– 2013 Master in Project Management
University of Management & Technology, Lahore
CGPA: 3.1
2006 – 2010 BSc. Industrial & Manufacturing Engineering
University of Engineering & Technology, Lahore
CGPA: 3.467/4 (Percentage 83%)
2003 – 2006 DAE in Mechanical
Government Institute of Technology, Gujranwala
Percentage: 72%
2001 – 2003 Matriculation (Physics, Chemistry, Biology & Math)
County Public High School, Gujrat
Percentage: 70%
DIPLOMA/CERTIFICATE
2011 – 2012 Diploma in Project Management
Alison, Ireland
2012 Certificate in Financial Management
Master Class Management Menlo Park California (94025), USA
2011 – 2012 Diploma in Production & Operation Management
Pakistan Institute of Modern Study (PIMS), Lahore
Pakistan
2012 Certificate in English Language
English Language Center from University of Engineering & Technology
English
2006 AutoCAD Mechanical (2D & 3D)
Pakistan Industrial Training Authority Center (PITAC), Lahore
Pakistan
2006 Mechanical Drafting
Pakistan Industrial Training Authority Center (PITAC), Lahore
JOB EXPERIENCE
Company: AMS Power & Industrial Engineering (Pvt.) Ltd
Position: Project Manager
Location: 1-C Canal Park Gulberg-II Lahore
Duration: 20 June 2014 to date
RESPONSIBILITIES:
Project Management
•
Project Execution
•
Financial Management
•
Project Bidding & Negotiation
•
Project Estimation
•
Total Quality Management
•
Business Development
•
Project Risk Analysis
•
PROJECTS:
Nishat Group –Define Scope, Supplier Pre-Qualification, Contractor Pre-Qualification,Evaluation
•
& Project Estimation of 17MW Power Plant for Nishat Mall Lahore.
Naveena Textile –Define Scope, Project Estimation for relocated 2 MW HFO base Power Plant
•
Ghazi Fabric –Fabrication & Erection of HFO Storage tanks for Ghazi Fabrics at Lahore
•
Ghazi Fabric –Pre-feasibility & Estimation of 2 x 4MW relocated Power Plant complete
•
including design, Installation & Commissioning
Wartsila– Project Estimation for 6 X 3MW HFO base power plant near Rawalpindi for Wartsila
•
Pakisatn
Pakistan Petroleum Limited –Construction of 6" NPS, Underground feeder line of 13kM for Well
•
Adhi-20 & Well-21(T/K)
Pakistan Petroleum Limited –Fabrication & Erection of Well heads of Well # 20 & 21 at Adhi Gas
•
Field.
Pakistan Petroleum Limited –Shutdown Work including bypass connections of Well # 17 & 19
•
at Adhi Gas Field
Company: TECHSCON Works (Pvt.) Ltd
Position: Manager Projects
Location: 23-D Phase-1 DHA, Lahore
Duration: 12Nov 2013 to 18June-2014
RESPONSIBILITIES:
Project Management
•
Financial Management
•
Production & Operation Management
•
Project Bidding & Negotiation
•
Project Estimation
•
Total Quality Management
•
Project Risk Analysis
•
Business Development
•
PROJECTS:
Crystalline Chemical Industry –Fabrication, Erection & Installation of Ethyl Acetate Plant Piping
•
Crystalline Chemical Industry –Erection & Installation of Ethyl Acetate Plant including plant
•
piping.
Crystalline Chemical Industry –Fabrication, Erection & Installation of Ethyl Acetate Plant
•
Structure.
Crystalline Chemical Industry –Construction of Molasses pits having capacity of 35,000 Mton.
•
Military Engineering Services –Fabrication & Erection of petrol storage tank having capacity of 2
•
Lac liters.
Unilever- Fabrication & Erection of butterfly shed at Rahim Yar Khan.
•
Hunza Sugar Mill- Fabrication & Erection of PEB building for filling unit at hunza sugar distillery.
•
NLC- Construction of building at NLC Thokar&Wagha for Canteens.
•
Company: IKAN Engineering Services (Pvt.) Ltd
Position: Project Planning & Control Engineer
Department: Project Planning & Control (PPC) Department
Location: 34Km, ShamkiBahtia, Multan Road, Lahore
Duration: 10 April 2010 to 10 Nov 2013
PROJECTS:
ICI PAKISTAN– Fabrication, Erection, Installation & Services for Shutdown of ICI Polyester Plant.
•
Huwaie (U-fone) – Supply & Fabrication 100 No’s of telecommunication towers/Poles &Mono
•
Poles.
SCHLUMBERGER - Refurbishment of Three Phase Separator
•
Sialkot International Airport Limited - Construction of two fixed walkway portions of Passenger
•
Boarding Bridges with Steel Structure
SCHLUMBERGER - Design & Fabrication and Construction of 15000 bbls Storage Tanks for
•
Condensate Oil Storage at Makori EPF for MOL Pakistan
NESTLE PAKISTAN–Supply, Fabrication and Erection of SS Water Silos of different capacity
•
NESTLE PAKISTAN –All type of projects (e.g. piping, Shifting &installation of different machines,
•
plants etc). in Nestle Kabirwala& Nestle Sheikhupura
OGDCL – Erection & Installation of Piping at Sinjhore Gas Plant
•
OGDCL– Erection& Installation of complete equipments of Sinjhore Gas Plant
•
AVANCEON - Construction of Civil Foundations, Supply, Fabrication & Erection of Lighting Poles
•
at Makori EPF, MOL Pakistan
OGDCL – Fabrication, Erection & Installation of Piping Rack Structure at Sinjohro Oil Filed
•
SCHLUMBERGER - Design, Fabrication & Supply of 02 Nos. of 500 bbls Atmospheric Gauge Tanks
•
OGDCL - Fabrication and Construction of 10 No’s of different capacity Storage Tanks for Sinjhoro
•
Oil Field.
PAK ELECTRON LIMITED (PEL) - Transformer Tank Bodies for Switchgear equipment
•
OGDCL - Fabrication and Construction of 04 No’s 15000 bbls Storage Tanks Sinjhoro Oil Field.
•
PSO - Fabrication and Erection of tube bundle
•
PSO - Fabrication and Erection of Heat Exchanger
•
UNDP Afghanistan - Long Term Agreement for the Fabrication and Supply of Pre-Fabricated
•
Porta Cabins
Attock Refinery Limited (ARL) - Fabrication & Supply of Vacuum Reflux Tank
•
RESPONSIBILITIES:
Meeting with clients & Inter department before start of any Project
•
Make detailed plan (up to level III), 3 Months & Four weeks rolling look ahead schedules.
•
Develop monthly, weekly & daily plans / execution targets (as per site requirement) and monitor
•
site progress as per plan
Prepare progress & analytical reports for submission to the client and company head
•
office as per requirements in line with project planning & controlling formats.
Responsible for implementation of all the contract activities in an efficient and controlled
•
manner.
• Manpower (Direct & Indirect) & Equipment Deployment
• Closely co-ordinates with client/Consultant for changes in plan, priorities, technical queries and
how they affect contractual obligations & milestones.
• Discipline-wise progress and efficiency reports on daily, weekly and monthly basis
• Invoices as per agreed invoicing procedure mention in contract.
• To oversee the execution of a project.
• Make close out report at the end of every project.
Additional Abilities:
Design &Designing calculations of the following
1. Pressure Vessels
2. Storage Tanks
3. Mixing Tanks with agitators
4. Steel Structures & its deflections
INTERNSHIPS FOR INDUSTRIAL EXPERIENCE
DESCON ENGINEERING SERVICES (PVT.) LIMITED
•
(1 month internship in Project Management Department)
IKAN ENGINEERING SERVICES (PVT.) LIMITED
•
(1 month internship in Research & Development Department)
MEMBERSHIP
Registered Member of PAKISTAN ENGINEERING COUNCIL (PEC).
•
TRAININGS
Gained Professional Training Program on PRIMAVERA (P6) conducted by IKAN.
•
Gained Professional Training Program on QUALITY ASSURANCE conducted by IKAN.
•
Gained Professional Training Program on TOTAL QUALITY MANAGEMENT conducted by IKAN
•
Gained Professional Training Program on BEST PRACTICE ON WORK PLACE conducted by IKAN.
•
Gained Professional Training Program on 7 HABBITS OF HIGHLY EFFECTIVE PEOPLE conducted
•
by IKAN.
COMPUTER SKILLS
Project Management Software’s: Ms Project, Primavera (P6 & P3)
•
Design Software’s: Auto Cad (2d & 3d), E-Tank, and Compress
•
Office Tools: MS Office, MS Visio
•
Operating Systems: MS Windows 9x, 2000, XP, Windows Vista
•
REFRENCES
Can be provided on request