OBJECTIVE: Construction Superintendent. A position in which my proven skills would be
of value.
QUALIFICATIONS
39 years in the construction industry, 28 of those years as a superintendent. Including accurate take
offs, schedules, buyouts, budgeting. Pre construction coordination, knowledge of civil construction,
structural concrete, tilt up, drilled piers, underground plumbing, electrical, flatwork, masonry, steel
fabrication, steel erection, structural stud steel framing, and aluminum wall and window/door
systems. Exterior finish systems. Interior framing, drywall systems and methods, interior finishes,
elevators, HVAC, electrical and fire protection systems.
Proficient computer skills: Primavera Sure Trak Scheduling P3, Prolog, Word, Works
On site supervision of contractors and sub contractors. Coordinate inspections with geotechnical
services and local government agencies having jurisdiction.
Effectively work with estimators, project managers, owners, architects, engineers, contractors,
inspectors, city officials, O.S.H.A. officials.
EDUCATION
1972 1975 Metro High school, Denver, CO
1975 1979 Carpenters Apprenticeship, Journeyman, Current member St Louis District Council.
CERTIFICATES
OSHA 10 Hour Construction Safety and Health
OSHA Confined Spaces Standards
OSHA Excavation Standards
OSHA Hazardous Communication
SWPPP Training 2008 CGP
First Aid/CPR expires 2/2016
REFERENCES
Available upon request
EMPLOYMENT
2010 2014 B & M Cillessen, Farmington, NM
General Superintendent
Webb Toyota, car dealership, new building with showroom, parts and
Service department, and lube pit. Lot size was 4 acres, the building was
70,000 sf. This project had a 6 month completion date, and was
finished ahead of schedule.
Aces engineering, new office and warehouse. 5800sf. Completed
ahead of schedule.
Apache Elementary, new administration addition & classroom remodel.
Completed ahead of schedule.
San Juan County District Attorney, new building. Completed ahead of
schedule.
Webb Chevrolet, existing car dealership, entire building remodel.
Completed on schedule.
PATH, homeless shelter 12,000 sf. with 12 apartments separate
Building. Completed ahead of schedule.
2008 2010 Jayne’s Corporation, Farmington, NM
General Superintendent
McKinley Elementary, Farmington Schools. Contract amount $13 million.
Supervise subcontractors, carpenters and laborers for self performed work.
Building size was 65,000 sf. of new construction. 10,000 sf. Demolition
Of a portion of the existing school. Remodel 8,000 sf of existing building.
The building portions of this job were finished 5 months ahead of schedule
2002 2008 K & S Assoc., St. Louis, MO
General Superintendent
Supervise carpenters & laborers for self performed work. Owensville, Missouri.
Elementary school. Contract amount 10.5 million dollars. 75,000 sq. ft.
Edwardsville Illinois 90,000 sq.ft. Elementary school. Contract amount, 13 million
dollars.
1999 2002 Orr Construction Co., Denver, CO
Superintendent
Supervise construction of buildings; from permit to punch list. 2 5 million dollar
range. Pad 28 20,000 sq. ft. shell for retail space in Littleton, co. Two story office
building 28,000 sq. ft. Bank tenant finish. Bank west Building, Parker, Co. Two
story office building 15,000 sq. ft.bldg. Stroh Ranch Development. Parker, Co. Two
story office building 25,000 sq. ft. Automatic Data Processing. Wheat Ridge, Co.
1996 1999 Denver Commercial Builders, Denver, CO
Superintendent
Gesco, office warehouses tilt up construction 45,000 sq. ft. Professional carpet
cleaning 30,000 sq. ft. Butler Steel building, Denver CO. Three office warehouse
buildings tilt up construction 230,000 sq. ft. Day’s Inn Hotel, Ramada Inn Hotel,
Holiday Inn Hotel. All were three story buildings being 300,000 sq. ft. each, on
same site, Denver, CO.
1997 1997 Colorado Structures, Colorado Springs, CO
Superintendent
King Soopers Center and Cheyenne Shopping Center. Grocery store and retail
shops. 600,000 sq. ft.
1986 1996 K & S Assoc., St Louis, MO
Superintendent
Alton Forensic 138,000 sq. ft. Mental Health facility. Southwest Airlines extension
to the east terminal at Lambert International Airport adding three gates. Addition
to C concourse for Southwest Airlines adding 2 gates. Several tenant projects at
Lambert, Paradies gifts shops and Starbucks Coffee. Several projects for the
Airport Authority. Several projects at McDonnell Douglas Aircraft, 3 years. Dog
Museum at Queeny Park. Several school projects both large and small. Endangered
Species and Veterinary Hospital, St Louis Zoo.
1980 1985 TIC ( The Industrial Company of Steamboat Springs)
Carpenter
Water treatment plant, Coors Brewery, Golden, Colorado. Peak 9
Breckenridge, Colorado. Climax Mine, Leadville, Colorado.