Post Job Free

Resume

Sign in

Project Manager Construction

Location:
Northport, AL, 35475
Posted:
August 21, 2010

Contact this candidate

Resume:

R E S U M E

William M. (Mike) Sharp - ***** Highway 69 North - Northport, AL. 35475

Email ablsq2@r.postjobfree.com - Cell phone 205-***-****

Summary

Accomplished construction management professional with more than 20 years

experience working in most U.S. states, the Caribbean and Western Europe

with multi diverse projects in industries such as Pulp and Paper;

Detention; Pharmaceutical; Chemical; Cold Storage and Distribution;

Commercial and Industrial.

I am an articulate and empathetic leader with a demonstrated ability to

undertake and complete the project at hand while diagnosing and solving key

issues, promoting and maintaining safety and customer loyalty.

Experience

ESI Constructors, Inc. Hartland, WI.

05/2007 - Present (on layoff 09/01/09)

Construction Manager

Directs the daily construction efforts of this design-build general

contractor engaged in the food service, cold storage and distribution

industry. Project range $1,000,000 - $40,000,000.

Projects:

October 2008 - September 2009

McKee Foods Corporation - Chattanooga, TN. $34.0MM

8,500 pallet position automated storage and retrieval system (AS/RS) using

the latest technology from Westfalia USA.

October 2007 - October 2008

SYSCO Foods - Portland, OR. $10.0MM

35,000SF freezer addition, IMP and concrete tilt wall construction;

35,000SF dry storage addition, IMP and concrete tilt wall construction;

additional site work including utilities and new truck parking; extensive

office remodel

July 2007 - October 2007

US Foodservice - Garland, TX. $26.0MM

100,000 SF addition and extensive remodel including freezer, produce and

dry storage. Also included new detached 2 story office building.

May 2007 - July 2007

US Foodservice - Zebulon, NC $16.0MM

100,000 SF addition including freezer, produce, meat and dry storage. Also

included 13,000 SF office remodel and truck maintenance remodel.

___________________________________________________________________

Primus Builders, Inc. Woodstock, Ga.

08/2004 - 04/2007

General Superintendent

Directs the daily construction efforts of this design-build general

contractor engaged in the food service, cold storage and distribution

industry. Project range $1,000,000 -$40,000,000.

Projects:

Sept 2006 - March 2007

Loop Fresh Produce - McAllen, TX. $5.0MM

50,000SF greenfield construction of a unique fresh produce facility.

Building included multiple rooms for a various mix of different produce

stored at multiple temperatures. Refrigeration system was freon and

included 16 separate systems. Dock height building constructed of IMP

including 4500 SF office constructed of stucco embossed IMP.

Sept 2005 - May 2006

VersaCold - La Porte, TX. $10.0MM

100,000SF addition to refrigerated warehouse, including 700 tons additional

ammonia refrigeration with the addition of four (4) each -40 degree blast

freezers. Structural steel / IMP freezer with concrete tilt wall dock and

support structure including new compressor room, electrical distribution

center, slatting / de-slatting area and employee break room.

May 2005 - Sept 2005

Dominos Pizza

No. Cal. Distribution Center

Hayward, CA. $0.5MM

Addition of a small -10F freezer inside the existing facility. IMP

construction with IMP roof (box in a box construction). Freon refrigeration

system.

Sept 2004 - April 2005

Kelley's Foods

Elba, AL. $2.6MM

60,000SF addition to existing facility, including -10F freezer, +28F

cooler, +55F produce and dry storage. Pre-engineered building construction,

IMP exterior and interior partition walls, additional ammonia

refrigeration.

___________________________________________________________________

BL Harbert International, Birmingham, AL.

Expat Superintendent

Projects:

03/2004 - 07/2004

Architectural Superintendent - OnSite in Humacao, Puerto Rico and working

in daily support of the Marbella Luxury Condo Project at Palmas del Mar for

Candelero Point Partners. Project value $18MM.

Directed an Hispanic workforce of 25+ Hispanic architectural and concrete

artisans.

Two (2) buildings arranged around an open atrium, pre-stressed 5 story

concrete post tension construction.

08/2003 - 03/2004

Architectural/Mechanical Superintendent - OnSite in Carolina, Puerto Rico

and working in daily support of the Eli Lilly Humalog Project working in

concert with Fluor as prime contractor and Pharmadule of Gotenburg, Sweden

as supplier of technology and equipment. Project value $1 Billion.

Project entailed the assembly and finish out of pre-assembled modules

shipped from Sweden and erected and hooked up on site in Puerto Rico.

Directed an Hispanic workforce of 100+ mechanical and architectural

laborors installing over 1MM SF of insulated metal panels. Completed

facility scheduled for the production of synthesized insulin product.

__________________________________________________________________

Buddy Jones Holdings, Cottondale, AL. 35453 01/2003 - 08/2003

Project Manager

Planed and managed a diversified portfolio of projects including new land

development, commercial design and general contracting, residential

development. Currently prime site contractor for Mercedes Benz USA plant

expansion. Project value $12MM

Willo Products Co., Inc. Decatur, AL.

Contract Project Manager

Full charge, on site project manager for specialized detention equipment

turnkey contractor.

Projects:

02/2002 - 10/2002

Bayamon, PR. with Bird Construction

Responsible for daily construction efforts of 750 bed intake and

classification center. Project value $40MM.

Directed a daily workforce of 20+ Hispanic mechanical and electrical

detention equipment specialists.

02/2002 - 10/2002

Ponce, PR. with Aireko Construction

Responsible for daily construction efforts of 500 bed intake and

classification center. Project value $35MM.

Directed a daily workforce of 20+ Hispanic mechanical and electrical

detention equipment specialists

(Projects worked concurrently)

___________________________________________________________________

Education

Associate Degree, John C. Calhoun Jr. College, Decatur, Alabama

Major: Drafting, Strength of Materials GPA 3.5

Coursework completed, John C. Calhoun Jr. College, Decatur, Alabama

Major: Mechanical Engineering GPA 3.5

___________________________________________________________________

Skills

* Bilingual (Spanish)

* MS Project

* MS PowerPoint

* MS Word

* Excel

* AutoCad

* OSHA 10 Hour Certification

* CPR Certified



Contact this candidate