Rene Rosal

**** ***** ********* *****

Rialto California 92336

Cell: 909-***-****

E-mail: abl7ye@r.postjobfree.com

Objective:

Looking for a position as an Electrical Instrumentation or Controls

Technician with a growing company where my skills and abilities will be

fully utilized.

Experience:

Intelligrated

Cincinnati, OH

Commissioning Engineer August 10, 2014

to November 14, 2014

. Responsible of commissioning project for Automatic sorters machine,

Inductions and conveyors. 90% of travel time.

. Responsible of electrical and mechanical installation in every project

site assign. Ensure and verify electrical, mechanical, PLC program and

VFD parameters according to electrical manual and costumer

requirements.

. Supervise contractors, electrician and mechanical installer. Obtain

information from the project site then provide update report to the

entire project engineer and corporate regarding the project situation.

. Work with PLC SIEMEN 7, Allen Bradley 5000, Lenze, linear motors,

vision system control panel, Danfoss Servo motor.

Kraft Foods

Fullerton, CA

Electro Mechanical Technician April

20, 2013 to August 2014

. Installed and repaired electrical systems, apparatus, and electrical

and electronic components of industrial machinery and equipment.

. Programmed and Troubleshot Programmable Logic control systems and

control wiring to determine problems. Provided technical support in

the area of electrical/controls. In charge of PLC control and machine

program.

. Worked to improve equipment effectiveness through meantime failure

analysis, root cause analysis and general troubleshooting, operation

maintenance and set up of production equipment.

. Implemented preventive maintenance work for equipment and facility in

accordance with the manufacturers and or engineering guidelines.

Evaluated or modified PMs with detail steps and parts to reduce

downtime of all production and facilities equipment.

. Supported the direction of the maintenance of physical assets of the

plant to insure continued operation and maintained and improved

electrical infrastructure main distribution, sub panels, transformers

and remote wiring for production machines.

Sunny Delight Beverage Company

Anaheim, CA

E/I-Electrical and Instrumentation Technician

March 2008 - November 2012

. PLC program monitoring, troubleshooting and programming for Allen

Bradley RS logix5000, RS Logix 5, RS Logix 500 series using RSLogix

software.Very familiar with network Data Highway, ControlNet,

DeviceNet and Ethernet.

. Start up and Commissioning new machinery, calibration of

instrumentation utilizing Yokogawa and Rosemont transmitter and hart

communicator.

. Temperature control, pressure flow, level probe, pH, conductivity.

Troubleshooting VFD system such as Power Flex 40, SEW servo control

system Parker, Pacific Scientific, HMI, Panel View Wonder Ware SCADA,

and MCC. Provided technical support for production equipment.

. Worked with the following equipment: CNC Fanuc Robot, routers, MCC and

Feeders, glue machine, Krones Labeller, Fillers, Palletizer,

Depalletizer, Bundler, Tray Packer, Lantec Wrapper, conveyors, Bottle

Coders, Rinser, Case Coders, Blenders Sterilization, Utilities

Chillers, Waste water, Boilers, Compressors.

. Ordered parts for electrical and mechanical equipment, record and

document work orders, on E&I log sheet, passdown implementation to all

Technicians in the plant.

Pall Medical Pharmaceutical

Covina, CA

Maintenance Mechanic Level 3 May

2001 to March 2006

. Performed breakdown, preventive, and corrective maintenance for

automation equipment. Supported engineering and production process

for machine upgrades and product improvement.

. Responsible for ordering mechanical and electrical parts. Worked with

following equipment: Fuji sealers, over wrap, filling machine, mix

room tanks, Denso Robots, conveyors, sterilizers, labelers and RF

machine, zebra and Sato printers. Auto clave and steam heat treatment.

Sony Electronics

San Diego, CA

Maintenance Mechanic/Electrician June

1995 to May 2001

. PLC custodian of equipment machinery, responded to production

equipment for breakdown, PM, CM, and supported production process and

engineering for equipment and product modification.

. Worked with the following equipment, Fanuc Robot, synchronize

conveyors, mix tank, xyz axis robots, turn table, centrifugal pump,

OMRON PLC programming modifications.

. Troubleshot Electrical related problem both facility and productions

equipment, install 480vac 240vac control panel, run electrical and

conduit to machinery, support productions process for breakdown

machinery, perform PM, CM, management projects regarding electrical

and automation equipment.

. Worked with the following equipment: Fryers, fuji wrappers, servo

motors, inverters, box makers, kitchen steamers, kettles, gear box,

automatic folders, and AC/DC motors.

Education:

ITT Technical Institute- San Bernardino, CA

AAS degree in Electronics Engineering Technology

Certifications:

Allen Bradley RS logix 5000, RS logix 500, RS logix 5 Control Logic

Programming

OMRON Control Logic Programming.

OSHA Electrical Safety.

Fanuc and Denso Robot programming.

Pneumatics, hydraulic.

Environmental Safety and Training, Commissioning, and Confined Space.

Special Skills:

Repair computer hardware, upgrade and knowledgeable to utilize software

such as Microsoft Word, Excel and Power Point. Basic programming for CAD

and Wonder ware Scada 9.0. Start up and commissioning new equipment

machinery and ARC FLASH analysis.

Languages: Fluent in Tagalog, English and basic Spanish.