Post Job Free

Resume

Sign in

Project Construction

Location:
Ann Arbor, MI
Salary:
65000
Posted:
January 21, 2015

Contact this candidate

Resume:

**** ********** ****, ***. ** 734-***-****

AAKASH MITTAL

Ann Arbor, MI 48105 abklrp@r.postjobfree.com

linkedin.com/in/aakashmittal1

Candidate For Entry-Level

Scheduler Estimator Project Controls

Construction Engineer with estimating, scheduling, and project engineering experience. Excellent ability to partner closely with

management, colleagues, clients, and sub-contractors. Strong understanding of planning, estimating, control of projects, bidding

process, scheduling CPM and PERT, resource leveling, earned value management, capital budgeting, construction fina ncial

accounting, life cycle cost analysis, energy management in buildings, and LEED certifications.

- Primavera P6 (30 PDUs), On-Screen Takeoff, Microsoft Project, SketchUp, AutoCAD

Software & - STAAD.Pro, Microsoft Office, Microsoft Access, JMP, MATLAB, FORTRAN, C/C++ Basics

Certifications:

- LEED Green Associate, Engineer in Training

Education & Awards

9/2013 – 12/2014

Masters in Construction Engineering and Management, University of Michigan

GPA 4.00/4.00 Tishman Master’s Fellowship Tau Beta Pi Honor Society, member

8/2009 – 5/2013

Bachelor of Technology in Civil Engineering, Indian Institute of Technology (IIT) Roorkee

GPA 9.09/10.00 Students' Initiative for Integrated Rural Development, Lead National Service Scheme, Joint Secretary

Professional Highlights

5/2014 – 7/2014

JS Vig Construction Company, Taylor, MI

General contractor providing project feasibility, construction management, cost estimation and project scheduling services.

INTERN – PROJECT ENGINEERING AND ESTIMATING

Client and Sub Relationships Bidding Process Quantity Take Off and Estimation Control of Projects Scheduling

Delivered recommendations to A/E for approval of product data, shop drawings, and sample submittals from subcontractors.

Handled timely resolution of issues through effective communication. Developed relationships with subcontractors and managed

bidding process. Created and maintained RFI logs, shop drawings schedules, and sub -contractor lists.

5/2012 – 7/2012

Pioneer Consulting Engineers (P) Ltd., New Delhi, India

Multi-service civil engineering firm specializing in civil, architectural and structural consultancy.

INTERN – PLANNING AND BUILDING DESIGN

Quantity Take Off Structural Analysis and Design Proficiency with STAAD.Pro Scheduling Planning

Designed structural members and prepared quantity take-offs and bill of materials for a 7-story commercial building. Created

structural layouts for a 17-acre residential group housing project. Prepared project drawings, specifications, and schedules.

5/2011 – 6/2011

Delhi Metro Rail Corporation, New Delhi, India

Technically complex mass transit system encompassing 193 kilometers of rail and 140 stations.

INTERN – INFRASRUCTURE DEVELOPMENT OF DELHI METRO

Data Analysis Modeling Projects Sub Contractor Coordination Site Experience Quality Assurance Checks

Monitored laying standard gauge rails and performed quality assurance checks. Studied design load standards. Conducted feasibility

of grade separated transport network by analyzing traffic volume data for a city with population of 1.8 million. Requested by leader

to model projects designed metro station security room, staircase, and generator room.

Project Experiences

9/2013 – 12/2013

Bid Proposal for Ann Arbor Fire Station, University of Michigan

Performed quantity take-offs and estimated costs for self-performed works according to drawings and specifications using RSMeans.

Selected bids from subcontractors and submitted a complete responsive bid.

9/2013 – 12/2013

Scheduling and Controls Project using Primavera P6, University of Michigan

Created a baseline schedule for sawmill construction project in Primavera P6 . Examined the project performance on data date and

updated progress. Identified the root cause for delays and cost overruns, and recommended corrective actions .

9/2014 – 12/2014

Construction Cost Engineering - Graduate Student Assistant, University of Michigan

Created problems on Work Breakdown Structures and Earned Value Analysis. Graded assignments on WBS, Earned Value

Analysis, Factor Estimates, Detailed Cost Estimates, Capital Budgeting, Learning Curve and Construction Financial Accounting.

Mixed-Use Real Estate Development in Detroit– Students’ Consultants group, University of Michigan 9/2014 – 12/2014

Conducted extensive neighborhood and stakeholders’ analysis. Presented schematic designs and financials for different

development options to the owner. Created a schedule in Primavera P6 and performed cost estimates using RSMeans 2013 .

1/2014 – Present

Excavator Machine Control to improve safety and productivity, University of Michigan

Hands-on experience of using total station for internal camera calibration. Evaluated technical feasibility of machine control system

using virtual prototyping in SketchUp. Conducted field experiments and analyzed experiment results to test the system accuracy.



Contact this candidate