S .M.BHARAT K abk2rz@r.postjobfree.com
abk2rz@r.postjobfree.com
OBJECTIVE
GAIN EXPERIENCE IN A POSITION THAT WILL BU ILD MY CAREER AND GAIN KNOWLEDGE, WHILE ALLOWING ME TO CONTRIBUTE TO
T HE SUCCESS OF THE CO MPANY .
EDUCATION
Indian Institute of Technology (BHU), Varanasi July 2011 – Current
B. Tech. in Chemical Engineering and Technology (Current CGPA:7.66)
Semester I II III IV V VI VII VIII
#
8.37#
SGPA 6.88* 6.96* 7.25* 8.12* 8.27 - -
#
YGPA 6.92* 7.70* 8.32 -
#
*absolute scale out of 10 relative scale out of 10
Sri Chaitanya Boys Jr. College 2011
Board of Intermediate Education (B.I.E) (Percentage: 92.3%)
Dr.K.K.R ‘S Gowtham International school 2009
Central Board of Secondary Education (C.B.S.E) (Percentage: 84.6%)
SKILLS AND INTERESTS
Languages: C, C++(Basic)
Cognizant software: HTRI, Aspen, Matlab, MS Office, Adobe.
Operating systems: Windows 8/7/XP.
Areas of interest: Process Engineering, Heat Transfer, Mass Transfer.
PROJECTS AND INTERNSHIPS
Project 1 LARSEN & TOUBRO-CHIYODA Ltd
(L&T-Chiyoda)
Vadodara, INDIA June-July 2014
Study Of Heat Exchanger Equipments And Thermal Design Of Shell And Tube Heat Exchangers
When, where and which type of heat exchanger to be used was studied .
Detailed study of Shell and Tube Heat Exchanger including TEMA classifications was done.
Heat Transfer Research Incorporation (HTRI) was acknowledged.
Thermal design of Shell and Tube Heat Exchanger for the given case studies was done using HTRI version 6.0 .
Got acquainted with Aspen and Fluent (both basic).
Supervisor: Assistant General Manager-Process Department, L&T-CHIYODA
Project 2 RELIANCE INDUSTRIES LIMITED-KG-D6
(R.I.L)
Kakinada, INDIA May-June 2014
Overview of KG-D6 Operations and Detailed Study of MAGCP Plant – Distillation column Calculations
Understood the operations involved in production from a gas field and processing of the gas at Reliance KG-D6.
Facilities are installed in handling the gas flow from 18 wells through Sub -sea onto the CRP from D1/D3 block of
KG-D6 field, and also from the oil well in MA field onto the FPSO.
Gas received at the Onshore Terminal is de-hydrated, compressed and sent as Sales Gas through the East -West
Pipeline
The MA Gas Condensate Stabilization train consists of a Stabilizer Column wi th a kettle type re-boiler and
overhead gas compression facilities.
Detailed study of MAGCP Plant and distillation column calculations was done.
Supervisor: Head-O&M, RIL-KG-D6
Project 3 OIL & NATURAL GAS CORPORATION Ltd
(O.N.G.C)
Hazira, INDIA December 2013
Preparing A Basic Engineering Package (BEP) For Propane Distillation Column For Hazira Plant, ONGC
(Fixed Parameters-PFD, Utility, Feed Conditions And Some Other Parameters)
Natural gas processing plant with a capacity of 46 MMSCMD
Built pressure profile of the process flow diagram devised.
Did column hydraulics (covering height, diameter and number of trays calculation).
Supervisor: Chief Engineer, Hazira plant, ONGC
ACHIEVEMENTS / EXTRA CURRICULAR ACTIVITIES
Participated in Industrial Defined Problem in UDBHAV 2013, chemical fest of IIT BHU
Participated in Paper Presentation in UDHBAV 2012, chemical fest if IIT BHU.
Lead the badminton team of my batch to a runners up position in UDHBAV 2013 as a captain.
Won several prizes in chess and badminton sports events in middle and high school.
Been a member of Kashi Utkarsh team, the social organization which works for the improvement of rural
children living in outskirts of Varanasi.
Built I-ROBOT (autonomous line follower bot), in Technex 2012/13 respectively.
PERSONAL INFORMATION
Father: K.Srinivas Gender: Male
Chief Engineer, O.N.G.C, Hazira Date of Birth: 27/08/1993
Ph. +919********* Languages: English, Hindi, Telugu
Address: C-2/26,PH-1,ONGC NAGAR, Surat Nationality: Indian
Passport available