PATRICK J. MONTALVO
**** ** *** **. ******** Pines Fl. 33025 Ph: 646-***-****
Email: abjirq@r.postjobfree.com
CAREER SUMMARY
Telecommunications professional with nine years of experience in various
methodologies of troubleshooting, cable networking and modifications.
Confident in offering future employer a strong commitment to excellence.
Energetic, hardworking, motivated, willing to learn, as well as a team
player.
EDUCATION
DeVry University, Online Expected
Graduation Date: 06/2013
Bachelor of Science in Network Communications Management GPA:
3.0/4.0
CERTIFICATIONS
AT&T Training -
. Fundamental Fault Locating & Cable Repair February 2009
. F2 Facility Work for PLS Area Stabilization September 2007
. Basic Installation & Maintenance, Part 2 September 2007
. Basic Installation & Maintenance, Part 1 August 2007
. Safe Pole Climbing & Ladder Handling July, 2007
. Hilti DXA - 40/41 March 2006
TECHNICAL SKILLS
. Installation of PBX switches.
. Proficient in Cable Splicing.
. Proficient in Reading Electrical Plats.
. Perform Davar Testing on Cross-Boxes.
. Advanced Knowledge of: Risers, links and networking cable.
. Troubleshoot, repair and maintenance of Telco and Data equipment.
. Advanced experience with: Butt set, Davar testing, Tempo Side kick,
Fluke tester, Fiber kit, Siemens tester, Modular tester, Probe/tone
generator, punch down tools (110, 66, Bix, & Krone), SawZaw, Hammer
drill, Shotgun and Band saw.
WORK EXPERIENCE
AT&T Telecommunications - Miami, FL. June 2007 -
October 2009
Facilities Technician
. Clear defective pairs, ANAC telephone and DSL circuits at NID
and various terminals.
. Spliced cables and cut Bridge Tap from cable splices and loop-
ups.
. Prepared aerial, underground splices and B-set terminals for U-
verse H.D. service.
. Troubleshooting techniques and knowledge of Telco. cable Color-
code.
. Davar and Bridge Tap testing with use of Copper Pro and Davar
test equipment.
PCCI, Inc. - Miami, FL. June
2006 to June 2007
Telecommunications Technician
. Allocated, terminated and tested Cat 3, 5e, and 6 cables.
. Allocated, terminated 110, 66, Krone, Bix and lightening
protection blocks.
. Allocated and prepared fiber optic cable with fan out kit
connectors.
. Forwarded D-marc, ISDN, and DSL, lines to customer premises.
. Troubleshoot station cables for Voice & Data and forward D-marc
in telco rooms.
. Used various test equipment including, Fluke, Siemens, Harris,
and Ideal.
. Installed data frames and ladder rack inside telco rooms.
Norcom Telecommunications - Thornwood, N.Y. April 2003 to
Dec. 2005
Telecom Network Technician
. Allocated terminated and tested CAT 5e and 6 cables for voice
and data lines.
. Allocated and prepared fiber optic cable with connectors.
. Installed/terminated 110, 66, Krone and bixs blocks.
. Forwarded POTS and ISDN lines from Dmarc to phone jack.
. Performed moves and changes for POTS and system lines.
. Installed PBX Norstar and Inter-tel systems.
Lucent Technologies - White Plains, N.Y.
September 2000 to July 2001
Installer
. Allocated telephone and fiber optic cable to distributing
frames.
. Wire-wrapped blocks for telephone lines and alarm systems.
. Installed grounds and batteries to Global Power Distribution
Frames.
. Connected line trunk peripherals to switch module controllers.
. Performed quality check-ups on equipment.