DON L. FAULKNER
*** ******** ******, ******** *******, Texas 75077
972-***-**** hm, 469-***-**** cell
abj5qn@r.postjobfree.com
[pic]
ENGINEERING MANAGEMENT/PLANT OPERATIONS
PROCESS IMPROVEMENT-COST REDUCTIONS-QUALITY IMPROVEMENT
[pic]
Experienced Manufacturing and Production Management professional with
extensive experience Managing Production, Engineering, Estimating, Cost
control, Quality, Assembly, and Safety. Areas of work knowledge include
Aerospace, Defense, Automotive, Stampings and Telecommunications
industries. Proven effective leader with high integrity and excellent
communication skills. Verifiable strengths in designing, improving
processes and work procedures in support of Lean continuous improvement
programs. Keen instincts to quickly effect change and process improvement
resulting in an improved bottom line. Versed in AS9100 and ISO9001 quality
systems including system implementation, management and audits. Excellent
interpersonal skills collaborate with all levels within any organization.
Strive to lead, coach, and mentor others to reach their full potential.
Develop strong teams with a positive attitudes and willingness to instill
this attitude in those I am associated. Well versed in various aspects of
manufacturing including; fabrication, machining, quality, inventory
management, assembly, safety, scheduling and facility maintenance.
QUALIFICATIONS:
. Mechanical and Industrial Engineering
. Quality Assurance and Quality Control
. Proven Management and Supervisory Skills
. ISO 9000 Facilitator and Internal Auditor
. Versed in the methods of Lean Manufacturing
. Outstanding Analytical and Problem Solving
. Excellent Verbal and Written Communications
. Project Management
. Six sigma Green belt
. Customer Service and Product Line Support
. Proficient with Auto Cad, Catia V5 Viewer, Word, Excel, Power Point
and Project
EXPERIENCE:
PCI-INDUSTRIES - FortWorth, Texas 2010 - Present
Process Improvement Engineer - Contract position
Analyze current processes to look for areas of process improvement using
concepts of lean manufacturing. Establish 5's program, kaizen events and
kanban systems. Train employees in the methods required to make the
transitions to lean a success. Develop process documentation and work
instructions as required. Lead in the development of quality process
manual for the organization.
. Design new fixtures and tooling
. Fabricate new tooling as required for project
. Evaluate new products for cost effectiveness
CAMtech Precision Manufacturing - Euless, Texas
Engineering Manager 2008 - 2009
Leads, directs and manages the daily CNC programming and Manufacturing
Engineering activities in a precision machining facility to ensure that
customer requirements and production goals are met.
. Managed the development and implementation of a new manufacturing and
assembly project for the A4 transport vehicle total revenue 10 million
in sales.
. Managed the Programming and Engineering for the new Gulfstream G650
project from prototype to production in six months - 150 parts, 1
million in annual revenue
. Established and implemented quick change tooling for pallets and
interchangeability
. Developed standardized NC documents to aide in the set up and
operation of machining centers
. Established schedules for programming and engineering to meet customer
delivery dates
QUICK-WAY STAMPINGS - Euless, Texas
Manufacturing/Quality Manager 2005 - 2007
Managed day-to-day Production, Engineering and Quality operations of a
short run stamping and manufacturing facility with 3 shifts and 70
employees.
. Instrumental in improving the companies overall production
capabilities from $450k per month to over $675k per month in sales
. Established internal/external quality tracking system to monitor and
improve overall quality through root cause analysis. This program
reduced internal rejects to less than 2% of jobs produced and customer
rejections to less than 1%
. Developed new product flow and work cells through value stream mapping
resulting in overall productivity improvement from 84% to 98% and
reduced indirect labor by 13%
. Reinstate ISO program to keep registry intact
. Managed and maintained 60,000 square foot manufacturing facility with
three 20,000 square foot facilities and 70 employees across 3 shifts
. Revised and improved safety program resulting in improved lost time
accidents from 24 in 2005 to 1 in the first seven months of 2007
CHAMPION/CLASSIC TRAILER - Lewisville, Texas
Production Manager / Quality Manager 2003 - 2005
Managed Production, Engineering, Quality and Safety operations of a custom
semi trailer manufacturing facility
. Re-designed 28,000 square foot facility to improve efficiency and
product flow using Lean Manufacturing concepts
. Improved overall plant productivity by 45% in the first 18 months
. Reduced warranty cost by 60% in the first 18 months
. Established DFM Engineering processes to improve product quality and
reduce lead-time
. Responsible for planning financial objectives and budgets
. Created and implemented inventory control system
. Developed Engineering procedures and set up standard design criteria
. Integrated the addition of new product line to current manufacturing
facility while maintaining standard product schedules
. Developed an approved vendor base to improve delivery and quality
. Improve lost time accidents from 10 in 2003 to 1 in 2005
JDF Group, Inc. - Lewisville, Texas
Owner / Program Director 2001
- 2003
. Created business plan to secure initial funding
. Developed an organization that focused on creating a positive work
environment
. Encouraged optimum performance and team effort
. Set company goals and expectations
. Established company policies
. Hired, trained, developed and provided guidance for all direct reports
Peterbilt Motors Company - Denton, Texas
Unit Manager 1998 - 2001
. Implemented training programs to address skill requirements to
increase efficiency and productivity improvements
. Developed cross training programs to improve quality, efficiency and
employee morale
. Responsible for three manufacturing departments with 35 direct reports
. Modified and improved processes which resulted in a 15% reduction of
scrap
. Improved overall departmental quality to less than 1% reject rate
. Responsible for production, quality, and efficiency of assigned
manufacturing areas in order to meet production schedules and delivery
dates
ANDREW CORPORATION - Denton, Texas (1981 - 1998)
Process Engineer - Contract position (8 month) 2003
Product Line - Terrestrial Microwave Product Specialist 1995 - 1998
Prototype Engineer 1994 - 1995
Senior Production Supervisor 1993 - 1994
Production Supervisor 1988 -1992
Quality Assurance Technician 1985 - 1988
Metal fabrication lead 1983 - 1985
Crate maker 1981 - 1983
EDUCATION: UNIVERSITY OF NORTH TEXAS - Denton, Texas
Bachelor of Science in Industrial Technology, December
1994
REFER ENCES: Available on request