CIRCON *** Phone number
LINDAVISTA and (81)
GUADALUPE NUEVO 83-64-16-31
LEON Cel. 811*******
E-mail:
hugolp_gz@yahoo.c
om.mx
ING. HUGO LOPEZ GARZA
Personal Information
Birthday : June 30 1975
Birthplace: Monterrey N.L. Mx.
Condition civil: Married
Professional Objective: To develop my professional habilities to improve
the conditions of manufacture and for applying to my knowledge and
experience in this company
Education: Mechanical engineer administrator, University Alfonso Reyes,
period 2000- 2004
Courses:PFMA (AAVID)
PPAP (AAVID)
Design of poke yoke (TITAN PLASTIC GROUP)
Internal auditor ISO 9001:2008, ISO 14000 and AS9100C
CMM PROGRAMER PC-DMIS second level (DONCASTERS)
Sigma Kaizen
Software: Office 2000,Gibbs Cam, Master cam X,Master cam9.1,File Maker,SolidWorks NX6,PC-DMIS 3.7++,Blade
Runner,Oracle
Language: English 90 percent.
WORK EXPERIENCE
TITAN PLASTIC GROUP
DEPARTMENT: MANUFACTURING
DESIGN OF LINES OF ENSAMBLY
PERSON IN CHARGE TO ARM, TO DEVELOP AND TO BALANCE LINE OF ENSAMBLY
APPLYING TECHNICAL POKA YOKES AND DETERMINING THE REQUIREMENTS OF
PRODUCTION, CREATING PROCESS LEAVES AND MAKING PFMA
TITAN PLASTIC GROUP
DEPARTMENT: MANUFACTURING
DESIGN OF MOLDS OF PLASTIC INYECTION
DESIGN OF MOLDS OF PLASTIC INJECTION FOR MATTEL, THOMAS AND BEST, FISHER
PRICE
AAVID TERMALLOY (MANUFACTURING)
DEPARTMENT: MAINTENANCE AND MANUFACTURES
PROCESS ENGINERR INOVATION
LOOK FOR THE BEST WAY TO ASSEMBLE, TO PROCESS, PACKING THE PRODUCT BY MEANS
OF THE TOOLS OF QUALITY LIKE TO PFMA, PPAP, APQP, ELABORATION OF 8 D
FOR ACTIONS CORRECTIVES, ACCOMPLISHMENT OF QUOTATIONS FOR FUTURE CLIENTS
ACCOMPLISHMENT OF PROFITS
THE APPROVAL OF PROJECTS AND RECOGNITION OF CLIENTS LIKE TO TOSHIBA,
PANASONIC, WATLOW, MDI ELECTRONIC, SQUARE D
THE DISMINUTION OF LEVELS OF SCRAP BY MEANS OF THE ELABORATION OF
ROUTES SPECIAL FOR EACH PRODUCT AND ACCOMPLISHMENT OF CONTROL LISTS
AN IMPORTANT PROJECT IN THE ELABORATION OF FIXTURE SPECIAL TO EVERY
PRODUCT, REDUCTION OF SMED.
DONCASTERS MEXICO(AEROSPACE)
DEPARMENT: ENGINEERING
PROCESS ENGINEER
DEVELOPMENT THE PROCESS OF MACHINING,CMM'S PROGRAM TO AIRFOILS AEROSPACE
.CONTINUOUS IMPROVEMENT IN THE PRODUCTION PROCESSES
ALSO SUPPLEMENT THE OPERATION WITH THE DOCUMENTATION NECESSARY LIKE,
DRAWINGS,ROUTE PROCESS,QUOTE,DEFINE STANDARS TIME.IMPROVMENT THE PROCESS
ESTABLISHED REDUCING THE COST OPERATIVE,INCREMENTING LIFE TIME OF THE TOOLS
AND OPTIMIZING THE RESOURCES OF THE COMPANY
INTEREST AREAS: PROCESS ENGINEER, MANUFACTURE, PROJECTS.