Haibo Qi
*** ********** ***, #*** . ******, MA **127 . 617-***-**** .
abhoe9@r.postjobfree.com
Work Experience
P&G Gillette, Boston, Massachusetts 05/2013 - Present
Project Manager - Venus Razor Brand
. Lead multimillion dollar projects from establishment to startup and
achieve committed volume ahead of schedules
. Prepare appropriation/funding package and achieve stretch goal in
total project costs by actively managing all aspects of development
and completion work of the engineering department, with emphasis on
early design basis completion
. Develop and manage detailed project schedules, overall risk
assessment, execution plan, and sourcing plan
. Lead regular project review with high-level management by
communicating and highlighting overall project progress, major risk
and mitigation plans, technical challenges, and help requests
. Support creation of all vendor acceptance test, commissioning, and
validation protocol documentation
P&G Gillette, Boston, Massachusetts 02/2011 - 05/2013
Line Manager - Manufacturing Plant
. Developed line master plans focused on PQCDSM improvement in a high-
speed 24/7 operation; managed 28 technicians' work and development
plans
. Implemented reliability engineering tools for the line, analyzed
monthly process reliability data, and developed ongoing improvement
plans, resulting in 400% increase in meantime between failure and 150%
increase in reliability
. Transformed a traditional operation line into a High Performance
Organization (HPO/LEAN) line within the plant
. Worked across different lines and functions within the site as the
department loss analysis leader; identified over $12M in savings and
delivered over $5M in bottom line savings in two years
. Led site engineering work process standard implementation, increased
standard tool usage in the site from 5% to over 90%, and improved
capitalization on time and vertical startup in the Boston plant
P&G, Kansas City, Kansas 12/2008 - 02/2011
Process Engineer - Material Process Delivery Group
. Delivered more than 10 formulation and material optimization projects
for the Dawn and Joy dish soaps by collaborating with R&D and
Manufacturing, resulting in over $8M in annual savings
. Optimized startup, shutdown, and changeover sequence for the
continuous liquid process operations; resulted in 10% cycle time and
3% scrap reduction
. Developed recycle add-back addition matrix based on formula family,
activity, and color; reduced overall recycle generated by Making
operations by 15%
. Implemented concentration alarm for the existing Making operations,
which enabled technicians to actively control finished product quality
based on incoming raw materials activity level and flow rate
Clorox Company, Pleasanton, CA 05/2008 - 08/2008
R&D Process Engineer Intern
. Designed and executed design of experiments to determine optimal
process settings to produce in-specs Hidden Valley Ranch slurry at 50%
reduced manufacturing processing time
. Evaluated the effects of optimized process on finished product
attributes and alternative formulas (Light, Fat Free) to test
robustness of the optimized settings and completed manufacturing scale-
up at the Reno manufacturing facility
Education
University of California, Berkeley
Bachelor of Science in Chemical Engineering, December 2008
Activities
P&G - Asian Pacific American (APA) Learning Pillar Leader, Boston,
Massachusetts
. Organized training sessions with high-level management focusing on
career development and interpersonal skills
Skills
. Proficient in Microsoft Office Suite, Microsoft Project, and SAP
. Fluent in spoken and written Mandarin Chinese