Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Cincinnati, OH
Posted:
January 14, 2015

Contact this candidate

Resume:

Haibo Qi

*** ********** ***, #*** . ******, MA **127 . 617-***-**** .

abhoe9@r.postjobfree.com

Work Experience

P&G Gillette, Boston, Massachusetts 05/2013 - Present

Project Manager - Venus Razor Brand

. Lead multimillion dollar projects from establishment to startup and

achieve committed volume ahead of schedules

. Prepare appropriation/funding package and achieve stretch goal in

total project costs by actively managing all aspects of development

and completion work of the engineering department, with emphasis on

early design basis completion

. Develop and manage detailed project schedules, overall risk

assessment, execution plan, and sourcing plan

. Lead regular project review with high-level management by

communicating and highlighting overall project progress, major risk

and mitigation plans, technical challenges, and help requests

. Support creation of all vendor acceptance test, commissioning, and

validation protocol documentation

P&G Gillette, Boston, Massachusetts 02/2011 - 05/2013

Line Manager - Manufacturing Plant

. Developed line master plans focused on PQCDSM improvement in a high-

speed 24/7 operation; managed 28 technicians' work and development

plans

. Implemented reliability engineering tools for the line, analyzed

monthly process reliability data, and developed ongoing improvement

plans, resulting in 400% increase in meantime between failure and 150%

increase in reliability

. Transformed a traditional operation line into a High Performance

Organization (HPO/LEAN) line within the plant

. Worked across different lines and functions within the site as the

department loss analysis leader; identified over $12M in savings and

delivered over $5M in bottom line savings in two years

. Led site engineering work process standard implementation, increased

standard tool usage in the site from 5% to over 90%, and improved

capitalization on time and vertical startup in the Boston plant

P&G, Kansas City, Kansas 12/2008 - 02/2011

Process Engineer - Material Process Delivery Group

. Delivered more than 10 formulation and material optimization projects

for the Dawn and Joy dish soaps by collaborating with R&D and

Manufacturing, resulting in over $8M in annual savings

. Optimized startup, shutdown, and changeover sequence for the

continuous liquid process operations; resulted in 10% cycle time and

3% scrap reduction

. Developed recycle add-back addition matrix based on formula family,

activity, and color; reduced overall recycle generated by Making

operations by 15%

. Implemented concentration alarm for the existing Making operations,

which enabled technicians to actively control finished product quality

based on incoming raw materials activity level and flow rate

Clorox Company, Pleasanton, CA 05/2008 - 08/2008

R&D Process Engineer Intern

. Designed and executed design of experiments to determine optimal

process settings to produce in-specs Hidden Valley Ranch slurry at 50%

reduced manufacturing processing time

. Evaluated the effects of optimized process on finished product

attributes and alternative formulas (Light, Fat Free) to test

robustness of the optimized settings and completed manufacturing scale-

up at the Reno manufacturing facility

Education

University of California, Berkeley

Bachelor of Science in Chemical Engineering, December 2008

Activities

P&G - Asian Pacific American (APA) Learning Pillar Leader, Boston,

Massachusetts

. Organized training sessions with high-level management focusing on

career development and interpersonal skills

Skills

. Proficient in Microsoft Office Suite, Microsoft Project, and SAP

. Fluent in spoken and written Mandarin Chinese



Contact this candidate