Electrical Engineer Construction

Location:
Bridge City, TX, 77611
Posted:
May 30, 2011

Contact this candidate

Resume:

Jay R. Cox

*** ******, ****** ****, ***** *****

409-***-**** 409-***-****

abhfi8@r.postjobfree.com

EDUCATION

Masters Degree of Science in Construction Management; Trinity University of

South Dakota

Bachelors Degree of Science in Electrical Engineering; Trinity University

of South Dakota

Associate Degree in Electricity and Electronics; Lamar University,

Beaumont, Texas

LICENSE

Texas Department of Licensing and Regulation

Journeyman Electrician

License number 00037063

R.A.E. Certified AreaRAE Professional

Registered Member of IEEE

TRAINING

OSHA Ten Hour Power Plant Fundamentals

NES Trenching and Excavation Basic Gas Turbine

Teambuilding Through Continuous Gas Turbine Support Systems

Improvement

Fisher Control Valve Gas Turbine Operation

Honeywell T D C 3000 Gas Turbine Control and

Protective Systems

NEC, API, ISA, NFPA, IEEE Gas Turbine Aero-Derivative

Foundation Field bus Gas Turbine Routine

Maintenance

Westinghouse Protective Relaying Gas Turbine Major Maintenance

AutoCAD 14, 2000, 2002, 2004, 2005, Combined Cycle Operation

2007, 2009

Micro station 3.1, 5.0 Heat Recovery Steam Generator

(HRSG)

Hull Maintenance Tech, 2nd Class, Generator Electrical Systems

U.S.N.

GENERAL ELECTRIC SAFETY TRAINING

Scaffolding Awareness Hazardous Chemicals in the

Workplace

Hand & Power Tools Excavation & Trenching

Personal Protective Equipment Electrical Safety

Fall Protection Awareness Confined Space Authorized

Lockout and Tagout Authorized Portable Fire Extinguishers

Walking, Working Surfaces & Ladder Mine Safety and Health MSHA

Safety 24 Hr

ENGINEERING

Engineering Supervisor, Instrument, electrical, controls, medium and low

voltage power coordination studies, ark flash, short circuit and ground

grid touch and step, protective relaying, high medium and low voltage power

distribution, VFD, VSD; Design, front-end load, P&ID and complete

construction package builder. Develop equipment requirements and

specifications, Vender bid packages, technical equipment evaluations. Start-

up and commissioning, trouble shoot field instrumentation and electrical

equipment, foundation field bus, HVAC, Client / vendor interface. Local

Utility metering interface, Energy management, Feasibility studies,

Budgets, Scope of work, Board or computer drafting.

CONSTRUCTION MANAGEMENT

Manage ten million dollar grass roots projects, Manage EPC power plant

construction projects, Client Representative, Coordinate between clients

and local utilities for Island Power requirements and offsite construction

requirements, Supervised engineering and construction packages for

correctness and construction feasibility; material tracking, track project

thru all phases of construction and start-up ensuring safety, QA/QC,

schedules and budgets.

SOFTWARE

ETAP 6.0, Windows 95, 98, NT4, Millennium Edition, NT4, 2000 Professional,

XP, Vista, Info-works, Set-route, Team-works, Microsoft Office 2007: Word,

Excel, Access, Allen-Bradley, Project, Estimation, AutoCAD 11, 12, 13, 14,

2000, 2002, 2004, 2005, 2007, 2009, Micro station 3.1, 5.0,

EMPLOYMENT HISTORY

Mar 2011, CURRENT

JACOBS, Tucson Arizona

Contract: Electrical Engineer at the Freeport-McMoRan Copper and Gold Inc.

facility in Safford Arizona. As building the electrical construction

package for one hundred, fifty million acid plant expansion turn over

documents Assisting in the client commissioning and turn over process. Two

month start up contract.

June 10, Nov. 2010

BEI Engineering Inc, Pasadena, Texas

Contract: Electrical Engineering Consultant at the Kinder Morgan Terminal

Inc.

May 09, May 10

Tessenderlo Kerley Services, Carlsbad, New Mexico

Contract: Senior Electrical Engineer in the Carlsbad Engineering Office.

Completed an EPC Construction Package for the Fresno California Production

Facility Expansion, Phase1 & 2. Currently assigned to the site at Fresno

for on site electrical engineering support and follow procurement.

Performing Over-current Coordination Studies for the Tessenderlo Kerley

Facilities that include Short Circuit, Ark Flash, Protective Relaying

Coordination and Grounding Grid Touch and Step studies using ETAP.

Jan 08, May 09

Eastern Bechtel Corporation limited, London, England

Engineering Field Supervisor assigned to Bechtel construction in United

Arab Emirates on GSACO ADG-2 project. Duties include commission of Low,

medium and high voltage switchgear, instrumentation, advanced control and

field engineering and commissioning of the Telecom and networks for a 1.2

billion dollar project. The compound and construction site are the remote

area one hundred miles south of the capital, Abu Dhabi in the desert.

May 08, Jan 09

Bechtel, Houston, Texas

Staff Project Electrical Engineer assigned to the Conoco Phillips Delayed

Coker International Technical License Group. Work directly with Conoco

Phillips international clients. Currently working on projects in Egypt,

Germany, Korea, France, Yanbu, Peru and the United States! Job scope

includes site-specific Delay Coker P&ID and license package development,

Instrumentation recommendations and specifications, data summaries,

resolution support to process engineering.

Sept. 07, May 08

Universal ENSCO, Houston, Texas

Staff Project Electrical Engineer Facilities group, currently working on

Enbridge Pipeline compressor and pump stations extending from Canada to

Texas. Projects included Goodrich (3000 hp VFD), Orange (Natural gas fired

Caterpillars); North and South Spur Extensions; Spectra and several other

operating companies. Job scope included managing various multi function

designer and cad groups, Right-Of-Ways, T&D, Unit substations, Grounding

grids, instrumentation, controls packages, vendor specifications packages,

technical evaluations and recommendations, long lead item schedules,

construction management, start-up and commissioning.

Feb.07, Sept. 07

BEI Engineering, Houston, Texas

Contract: Farmed out to Dixie Chemical in Pasadena, Texas as the Senior

Electrical Engineer for the plant.

Feb.06, Jan. 07

William's Fire and Hazard Control Inc.

(One-year contract) Electrical Department Head / Product Manager; Contract,

Duties include New Product Research and Development, all instrument and

electrical design packages for electrical remote operated multi and single

unit applications, Research and development of automated detection and

mitigations applications and European Compliance Documentation (CE & ATEX).

Sept. 05, Feb.06

General Electric, Energy Division, Chicago, Illinois

Contracted to General Electric Energy Division by Penn Power out of Tampa

Florida to fill the Position of Construction Superintendent for grass root

substations and substation up grades though out the Oklahoma region.

Sept. 05, Feb. 06

McBride Electric, Orange, Texas

Reconstruction superintendent after Hurricane's Katrina and Rita at LaFarge

Cement facilities in Westlake and New Orleans Louisiana

(1) Westlake facility abstained 125 MPH winds and rain and six feet of

floodwater. As site superintendent, established temporary power and control

functions in two days. Refurbished and brought back on line the 2400 and

480 volt plant wide operations in ten days.

(2) New Orleans Facility is located on Industrial Canal in the Lower Ninth

Ward and is the show case site for Lafarge. The site was devastated by

sustained 175 MPH wind with gusts up to 200 MPH. The wharf area was seven

feet under water and the main plant was three feet under water leaving the

entire facility covered with three plus inches of mud from Lake

Pontchartrain. As site superintendent, I had to take charge and make

everything happen. Temporary power and a man camp where established in two

days. 2400 and 480 volt power systems where refurbished or replaced. ABB

plant wide control systems where dried out, repaired and placed back in

operation. 1500 KV dry transformers had to be boiled out and reconditioned

along with dozens of motors ranging from 450 HP down. The resources were

very limited in the region and had to be brought in. The Plant was

operational and turned over to plant personnel and a reduced start up crew.

Feb. 04, Sept. 05

Industrial Specialties Contractors LLC, Baton Rouge, Louisiana

Emerson Delta V Foundation Upgrade, CR-3 Unit, Shell Refining, Deerpark,

Texas

Estimating, Baton Rouge Office

Electrical Design Engineer, Baton Rouge Office, Marathon Oil, Grayville,

Louisiana, for the Gas Desulfurization Project, satellite expansion, heat

tracing and power and controls

Linde Corporation, Tulsa Oklahoma, Commissioning engineer for a Praxair

hydrogen separation Plant in Port Arthur Texas

Dupont, Beaumont Texas, Consultant for Honeywell FTA and Configuration

upgrade

Huntsman, Port Neches, Texas Site supervisor for I/E commissioning after

explosion reconstruction

August 02 Jan. 03

Yoh International Corporation, Houston Texas

Project: Assistant Project Construction Manager for USFilter. Farmed out

from Yoh International to USFilter at the Cinergy Construction site at BP

Amoco Plant in Texas City, Texas. My work Description includes Assisting

the Project Manager in all phases of construction and client interface.

Daily work responsibilities include: OA/OC, Preparing and issuing all turn

over QA/QC manuals, assist in resolving issues between Engineering and

Construction, tracking all phase of construction, attend weekly and daily

schedule meetings and work with all subcontractors in the field on a daily

base. The job scope includes one retro fit and two grass root water plants.

August 01 May 02

Dashiell Corporation, Houston Texas

Project Construction Manager for the 500 KVA substation located in

Cottonwood Texas. Intergen Is constructing a Billion Dollar Combined Cycle

facility that includes four combustion turbines, four steam turbines, four

HRSG's and four 500 KVA step up transformers that feed the grid thru two

gas circuit breakers and corresponding transmission lines. My

responsibilities as the project manger are (1) To set up construction

facilities and operations in remote locations (2) To over see all phases of

engineering including civil, structural, HVAC, Foundation Fieldbus and

energy management (3) To schedule and receive all materials (4) To schedule

all sub-tier contractors in bid negotiations and construction (5) To insure

that all safety, QA/QC programs are maintained, construction and back-feed

schedules are meet and the product warranty is full filled (6) Dashiell

Corporation's Field representative for all interactions with the client

which includes attending client required meetings, reporting, documentation

and entertain as necessary. A typical Dashiell Construction Manager

maintains up to four projects simultaneously. Received Bechtel Certificate

of Award for Zero Injuries in 2001.

August 00 August 01

Calpine Corporation, Folsom California

Assistant Project Engineer (Electrical) - Corpus Christi Energy Center is

an E.P.C. joint venture between Sergeant & Lundy Engineering and Zachry

Construction. My responsibilities as a corporate liaison are the over

seeing engineering and construction of a four hundred and eighty megawatt

combined cycle facility, switchyard which will tie the main step up

transformers to the local power company grid and power transmission loop

that will service Citgo Refining, Koch Refining and Elementis Chromium

Facility. Dailey work routine included Quality control in the civil,

piping, mechanical, structural, environmental, High, Medium And low

voltage, Power transmission and distribution, sub-station, grid

stabilization, energy management, HVAC, Foundation Fieldbus and DCS. My

areas of expertise are DCS, Foundation Fieldbus, medium voltage power

distribution, and power transmission and distribution as well as

construction progress reporting to corporate office.

April 94 thru August 00

Southern Design - LaBell, Texas

Project (1) Lead Designer for Houston Ammonia Terminal's new control room,

consoles, and SCADA Control system. Designed the control interconnecting

wiring diagrams Loops sheets, and controls schemes for the medium and low

voltage control, marshalling cabinets, console layout and SCADA

terminations. (2) Contract Instrument and Electrical Designer for Chevron

Chemical Research and development Pilot Plant in Orange, Texas. Produced

the construction package for the D-Gas Phase Grass roots Polymer reactor

unit and the construction package for the De-bottleneck design for C-Gas

phase polymer reactor unit. Perform all the engineering drafting office

responsibilities, in-house projects, energy management and data acquisition

BES Inc. Bath Electrical System, Beaumont, Texas

Project - Field Service Tech., preformed maintenance and calibrations for

protective relaying, transformer, hi-pot testing, trouble shooting for

routine maintenance, new installations and commissioning projects at Mobil

Oil, Mobil Chemical, Diboll Paper Company and Ausimont USA.

CDI Stubbs Overbech, Sulfur, Louisiana

Project - Senior I/E Designer in-house and field for Olin Chemical,

Westlake Boiler House. Field verified and updated all the Process and

Instrument Diagrams to meet OSHA requirements for the facility.

MATRIX Engineering, Beaumont, Texas

Project - I/E Designer: (1) Mobil Oil Refining Retrofitted new gas

compressor to existing electrical switch gear and advanced control system

(2) Star Enterprise #3 Boiler House Field verified and updated all the

Process and Instrument Diagrams to meet OSHA requirements for the facility

(3) Georgia Pacific Paper Co. Distributive Control System upgrade on paper

dryers and processing equipment (4) Fina Oil and Refining Company, Field

verified and updated all the Process and Instrument Diagrams to meet OSHA

requirements for the facility. (5) Clark Oil and Refining Company, 1996

annual maintained turnaround. Engineered two hundred and sixteen upgrade

construction packages in the Oil Cracking area, Compressor House, Control

Rooms, Processing units, high and medium voltage switchgear, and unit

Deluge system.

CDI Stubbs Overbech, Beaumont, Texas

Project - Senior I/E Designer (1) Mobil BSCP Oil Additives Plant, Designed

the DCS Modernization Construction package utilizing a Honeywell TDC 3000.

Designed the associated expansion construction package. (2) Electrical and

Instrument construction package checker Bayer Rubber Plant, Orange, Texas

FEB. 94 THRU SEPT. 94

Kaiser Alumina & Chemical Corporation, Alumina Partners of Jamaica

(ALPART), Jamaica, West Indies

Project - Project Engineer, Produced a feasibility study, scope of work,

budget, construction package, specifications, and procurement for the Ball

Mill and Slurry Mix Control System Upgrade. I designed an Allen Bradley 5-

PLC control system to integrate with the existing medium voltage

switchgear, energy management, HVAC and process equipment along with a

ninety six-point panel alarm and a human interface workstation in the

boiler control house. I lived in the Spurtree housing compound on the

Island and worked on a daily schedule with the Americans and Jamaican staff

to acquire the necessary information and resources.

FEB. 92 THRU FEB. 94

Bell Engineering, Vidor, Texas

Project - (1) Senior I/E Designer, Ausimont, USA Orange, Texas worked with

a staff of engineers and designers to engineer and construct the first

Monomer Halar Recover Unit in the world, Our engineering group worked on

site and produced the instrument and electrical, energy management, civil,

piping, mechanical construction, HVAC packages, produced the bid packages

and held bid meetings, followed deliveries and construction, preformed the

check out and commissioned the final process unit (2) In-house Electrical

Engineer for Ausimont main plant, I handled all day to day instrument and

electrical responsibilities as well as maintained all the I/E Maintenance,

design and archives.

SEPT 90 THRU FEB. 92

Petrocon Engineering, Beaumont, Texas

Project - (1) Senior I/E Designer on Dupont Sabine Riverworks Catalyst

Decanter System for C, D, & G units, Performed the field research, acquired

the vendor design specification and designed the construction package to

upgrade the multi line catalyst regeneration units. (2) Senior I/E Designer

on Mobil O&A Chemical Plant Performed the process and instrument diagram

update that is necessary for the Honeywell TDC 3000 modernization

construction package, performed the field research and produced an

instrument, control and electrical construction package for the boiler

house and plant wide movements, (3) Senior I/E Designer for Aleyska

Pipeline (Alaska Pipeline) Feasibility study at the Valdez Loading

Facility, Valdez, Alaska. The basic research was done on a five-week stay

in Anchorage and Valdez. We interviewed management, operations and

maintenance to determine there control needs. Second, interviewed several

distributive control and PLC manufacturing companies to achieve a broad

base of control prospects for Aleyska. The feasibility study called out the

areas that needed attention base on priorities from the interviews. Our

study laid out several scenarios base on performance and cost an organized

form first preference down. (4) Senior I/E Designer - Surveyor for Texaco

Natural Gas Co. Worked in remote locations in two locations in Oklahoma and

one in New Mexico. Field verified and updated all the Process and

Instrument Diagrams to meet OSHA requirements for the facility.

AUG. 88 THRU SEPT. 90

American Technical Services - Malvern, Penn.

Project (1) Construction Manger at Dupont Chambers Works, Deepwater, N.J.

Relocated a medium voltage motor control center and chemical cracker unit

control room to a centralized in-plant location (2) DCS upgrade at

Monsanto, Thorofare, N.J. Red lined the interconnection diagrams and field

identified the all the cable tray and cabling. (3) I/E Supervisor for

Pennwalt/Atochem, Thorofare, N.J.; prepared the I/E Department for a plant

wide sale.



Contact this candidate