Sign in

QA/QC Inspector/Welding Inspector

United States
December 21, 2012
Contact Info:


Phone: +** *** ** *** ***


Additional Information

Other Personal Data Name : Abdul Gozi Sex : Male DOB & Place : August 28, 1983, Presak Batunyala, NTB Nationality : Indonesian Marital Status : Married Passport No. : S 878775


Formal Education

Mechanical Engineer

Universitas Riau Kepulauan Batam.

Senior High School : Darul Muhajirin Praya (NTB) Junior High School : Nurusobah Batunyala(NTB) Elementary School : Nurusobah Batunyala (NTB) Objective Has been worked for more than 7 years on various EPC Oil and gas Company in national region.

Knowledge for fabrication and inspection steps (structure/PV/Tank/piping), Product Testing (NDT, Hydrostatic/Pneumatic/Leak), PMI, hardness, PWHT, dimension, measurement, material, welding procedure related for mechanical properties and testing Other responsibility which has been assigned: Prepared document and inspection method; Acceptance criteria based on client requirement; Code/standard or approved spec; weld map, check lay out point; Inspect cut length, dimension of structure during Fit-up, check welding preparation (type of joint; Determined and monitoring welding sequence; Welding parameter to minimize distortion control; Check weld size of wel.

Nov 2012 to Current


QA/QC Weldig Inspector

Sept 2011 to Sept 2012

FPSO Cidade de Mangaratiba MV24

On behalf Weldig Inspector

PT.Newmont Nusa Tenggara (NTB).


Diesel Fuel Line Replacement (DFLR).

From Km0 to Km14 Pipeline.

Aug 2011

QC Inspector

PT.Ozzielink Singpore.

Pree Running PQR for Emas Offshore to OSL.

Feb. 2011 to June 2011

Structural Inspector


Indosummit Sejahtera to Saipem Leighton Consortium Bandar Lampung.

Oct. 2009 to Jun. 2011

Barrow Island LNG Jetty Super Structure

QA/QC Coordinator


Megaron Semesta (Wasco), Batam Project Completed: Jubilee E-House (Siemens - Modec)Condensate Treatment Package for Gajah Baru Project (Saipem - Premier Oil natuna) Waste Water Treatment packages for Pressure Vessel and Tankage (Technip-Petronas Carigali Turkmenistan) Petrobras 55 for E-House (Siemens-Quip-PNBV) TGT Development Project for E-House (Siemens - Bumi Armada Bhd).

Oct. 2008 to Aug. 2009

Structural and Piping Inspector


Fabrication Nusantara Global, Batam Project Completed: OYO Project Development E-House (Siemens - Bumi Armada Bhd) Bintulu Compression Project (Gas Service International - Murphy Oil Sabah) Pluto LNG Project (Veolia O&G, FWW - Woodside).

Jul. 2008 to Sep. 2008

NDT Technician


Sucofindo Cilegon Indonesia, Cilegon.

Project Completed:.

Transportasi Gas Indonesia ( TGI ) at PT.

south East Asian Pipe Industries (SEAPI) Bandar Lampung.

Oct. 2007 to Feb. 2008

Piping Inspector


MAN Ferostal indonesia, Palembang.

Project Completed:.

SSWJ-CP-5PGN Project Pagar Dewa (PGN).

Feb. 2007 to Aug. 2007

Structure and Piping Inspector


Wasa Mitra Engineering, Batam.

Project Completed:.

Kerisi Development Project - CPP (SMOE - ConocoPhillips Indonesia.

Sep. 2006 to Nov. 2006

NDT Technician


Wismar Inspectindo (Candra Asri), Cilegon.

Project Completed:.

Turnaround maintenance.