Post Job Free
Sign in

Construction Superintendent

Location:
Uvalde, TX, 78801
Salary:
65000.00
Posted:
January 02, 2013

Contact this candidate

Resume:

STEVEN H. DARBY

P.O. Box ****

Uvalde, Texas

abgkdz@r.postjobfree.com

Cell# 910-***-****

CAREER SUMMARY/STRENGTHS

Construction Superintendent with over fifteen years of demonstrated successful supervisory experience in a variety of Construction Industry arenas, including government, commercial and residential construction. Experience with Corps of Engineers and NAVFAC on multi-million dollar projects. Supervision of all phases of projects from start to finish. Extensive experience in all aspects of concrete construction and “tilt-up”. Earned 30 Hours OSHA Safety Certification - 3/2012.

Strengths include:

• Supervising a 100 million dollar project achieving 2 million man hours without a lost time accident. Never before accomplished on a Federal Facility.

• A reputation for always finishing projects on-time and within budget.

• Being continually evaluated high by superiors.

• Demonstrated ability to work well with multiple sub-contractors and employees.

TECHNICAL SKILLS

• Experienced in all phases of concrete, residential and commercial construction. Extensive tilt-up experience throughout my career.

• Adherence to Specifications and Blueprint Reading

• Quality Control Inspector

• Energy Control Lockout

• Hazard Communications

• Operation of Survey Equipment (Total Station)

• Operation of small heavy equipment

• Non-certified welder

• Hydraulic Principles

• Geometric Tolerances

• Machine Principles

• Valenite Gauging and Air Gauge Systems

• Basic Tooling Principles

WORK EXPERIENCE

TETRA TECH CONSTRUCTION CO., Pasadena, Calif., Sept-2012 to Dec-2012

Foundation Superintendent, Anacacho Wind Farm, Bracketville, Texas Superintendent responsible for the placement of Concrete and supervision of a concrete crew for the installation of structural concrete for Wind Towers.

CADDELL CONSTRUCTION CO. INC., Montgomery, AL Mar. 2006- Dec. 2011

Superintendent

Supervised all phases, start to finish, of projects ranging from 5-100 million dollars, supervised and scheduled all subcontractors from ground up. Worked directly with Government entities:

Corps of Engineers and NAVFAC. Achieved 2,000,000 man hours with no lost time accidents.

LODGE CONSTRUCTION COMPANY, Ft. Myers, FL Nov. 2001-Mar. 2006

Superintendent

Supervised all phases, start to finish, of commercial construction projects. Completed Municipal work including import and compaction of 110,000 cubic yards of structural fill for building pad. Supervised construction of a three Story School for Redlands Christian Minority Authority (RCMA), Refuge Disposal Transfer Facility and a Post Office Distribution Complex and a bank.

EMERSON CONSTRUCTION CO., Belton, TX Feb. 2000 – Nov 2001 Superintendent

Responsible for supervision of all phases, start to finish, of construction of 160,000 sq.ft. Super Walmart, scheduling subcontractors and incoming materials. Worked closely with State and City governing agencies.

AUSTIN PACESETTER CONSTRUCTION, Austin, TX 1998-2000

Concrete Superintendent

Supervised all phases of commercial multi-family apartments. Supervised three crews of approximately 25 men, experience in post tension cable system.

OLSON MECHANICAL & HEAVY RIGGING, Wilsonville, OR 1996-1998

Assistant Superintendent

Assisted in all phases of Willamette City Falls Fish Way construction Reinforced concrete slabs and walls. Installed hydraulic piping for sluice gates and 2 inch overhead piping.

EAGLE MANUFACTURING CO., Florence, KY 1992-1996

Assistant Leader

Supervised a 16 Machine Line. Installed and aligned machinery to operate at set tolerances. Operated 6&8 Station Dial Machines, Horizontal/Vertical Broach Machines, 8 Station Transfer Machine and Horizontal Boring Machine (working tolerance of .0001 + .0002).

BECHTEL CONSTRUCTION CO., Tucson, AZ 1988-1992

Construction Foreman

Fabricated Electro-Winning/Solvent Extraction Plant. Involved in all phases of construction, from start to finish and installed equipment and performed extensive blueprint work.

CERTIFICATIONS

30 Hr. OSHA Safety Certificate acquired 3/2012

10 Hr. OSHA Safety Certificate

NAVFAC Safety Certificate of Recognition and Employers Safety Awards

OSHA Scaffold Safety Competent Person Certificate

Zenger-Miller Front-Line Leadership I and II

EDUCATION

LANE COMMUNITY COLLEGE, Eugene, OR

Drafting and Mechanical Engineering, 2 years

ODESSA COMMUNITY COLLEGE, Odessa, TX

Quality Control Welding

SKILL SET Modular Barracks Construction Quality Control Wind Farm Construction Waste Facility Construction Post Office Distribution Complex Construction Nuclear Plant Construction Hydroelectric Dam Construction Maintenance Facilities Administration Facilities PROFESSIONAL REFERENCES Sid Adams, District Project Manager, Caddell Construction Inc., 334-***-****, abgkdz@r.postjobfree.com John Davis, Plant Manager, Retired, 859-***-**** Mark Darby, Project Manager, Tri-state Construction Inc., 303-***-****, abgkdz@r.postjobfree.com Mike Dunn, Vice President-Project Manager, Lodge Construction Inc., 239-***-****



Contact this candidate