Post Job Free

Resume

Sign in

AutoCAD Drafter

Location:
United States
Posted:
October 06, 2013

Contact this candidate

Resume:

PERSONAL DATA

DRAFTSMAN

Position Applied :

NAME : NOEL M. GERONIMO

Present Address : **** ***** ********* ******

Chicago, Illinos 60625

Contact Number : 1-872-***-****

1-773-***-****

E-mail Address : ab9y0n@r.postjobfree.com

Profession : CIVIL ENGINEER

Date & Place of Birth : December 04, 1966 - Pulilan, Bulacan

Nationality / Age : Filipino / 46 years old

Religion : Roman Catholic

Civil Status/ Height/ Wt. : Married / 5’6” / 73kg.

License : Philippine Civil Engineer License No. 0055889, issued 1989

Philippine Prof Driver’s License No. D06-90-061192

EDUCATIONAL BACKGROUND

COLLEGE : Bulacan College of Arts and Trades

(presently Bulacan State University) - Graduate 1988 (BSCE)

1st Place, CE Quiz 1988 (Design & Construction)

SECONDARY : Saint Dominic Academy - Graduate 1983

Artist of the Year

PRIMARY : Pulilan Central School - Graduate 1979

Mathematician of the Year

SPECIAL SKILLS:

Ability to design Structures using WSD

Ability to work with the following softwares:

AutoCAD Rel. 12 to 2013 Extensive knowledge including 3D modeling, basic rendering

with Materials and Lighting applications, AutoLISP,

Customization of Menus, etc.

Microsoft Excel Extensive knowledge including formulating data on tabulated

reports, quantity, design and other engineering related works.

Microsoft Word/ Internet Create and manage correspondences

Adobe Photoshop Edit site photos for weekly and monthly progress reports

Others Ability to troubleshoot computer problems

SEMINARS ATTENDED:

PICE Seminar - Material Testing and Quality Assurance - Leyte Park Hotel, Tacloban City,

Leyte (October 22 to 26, 2012)

Training on Quality Assurance and Contract Administration in the NIA Projects’ Civil Works

Contracts – Cozy Place, Rosales, Pangasinan (November 20 to 22, 2012)

Page 1 of 4

EMPLOYMENT HISTORY

COMPANY POSITION INCLUSIVE PERIOD

(1). National Irrigation Administration Engineer B (Casual) September 04, 2013

Quezon City, Philippines to July 14, 2013

Projects:

Construction of Marimay Dam and Irrigation Facilities, Apayao and Irrigation Facilities

Job Description:

General Work:

Supervise and report Construction activities for the project.

COMPANY POSITION INCLUSIVE PERIOD

(2). National Irrigation Administration Engineer A (Contractual) February 23, 2013

Region 1 Office, Philippines to September 03, 2013

Projects:

Construction of San Angel Dam and Irrigation Facilities, Rosales, Pangasinan, Philippines

Construction Masidem Dam and Irrigation Facilities, Bani Pangasinan, Philippines

Job Description:

General Work:

Draft remaning work requirements for Irrigation Facilities for San Angel Irrigation Facilities.

Draft drawings for Irrigation Facilities for Masidem project.

COMPANY POSITION INCLUSIVE PERIOD

(3). Arabian Bemco Cont. Co. Ltd. Site AutoCADD January 27, 1997

Jeddah, K. S. A. Rel.14 to Rel. 2010 to October 07, 2010

Projects:

Riyadh – PP10 Project – April 2009 to October 2010

Najran PS Extension Project (Optional Unit 50 MegaWatts Capacity) – Two years

Hail 2 Power Extension Project (Main Unit 50 MegaWatts Capacity) – One year

Najran PS Extension Project (Main Units 50 MegaWatts Capacity) – One year

Tabouk II CPS Extension Project (Two Units 50 MegaWatts Capacity) – One year & six months

Jizan CPS and Jizan CPS extension 1 and 2 (Base & Optional Units), 50+50 MegaWatts

Capacity – Four years & six months

Asir CPS extension1 (50 MegaWatts Capacity) – One year

Various Projects at Head Office – One year

Riyadh – PP9 Project (Combined Cycle, 1200MW) – Four months from Jan 1997 (hiring date)

Job Description:

General Work:

Make FCN and DCN in coordination with site engineers by checking existing utilities from all

available drawings.

Page 2 of 4

Assist Site Engineers on drawings required for RFIs.

Draw sketches (usually details, sections and isometric to be clearly understood by client or for

site use).

Other Works not mentioned above:

Najran 2, Hail and Najran 1 Projects:

(Main Units and Optional Unit) Review and revise Civil Quantities (excavation, backfiling,

formworks, waterproofing, concrete and steel) submitted by Civil Subcontractor M/s A.S. Al-

Husseini.

Update Punch List and Warranty Claim status and generate report to the Site Manager.

Chosen as Outstanding Employee for “Outstanding Employee’s Quarterly Evaluation” from April

2006 to June 2006.

Tabouk Project:

Finalized as-built drawings for Tabouk II CPS Ext. Project (Two Units 50 Megawatts)

Make FCN by checking existing utilities from all available drawings in coordination with site

engineers.

Mark-up drawings required prior to submittal of As-built as per FCNs, DCNs and MOMs.

Jizan 2 Project:

Review and revise Civil Quantities (excavation, backfiling, formworks, waterproofing, concrete

and steel) prior to invoice submittal by Civil Subcontractor M/s Al-Saad Cont. Co.

Update Primavera P3e schedule as per actual site progress coordinated with site engineers.

Generate daily, weekly, monthly and yearly reports through coordination with Bemco Engineers

and Sub-Contractors (Al-Saad Contracting, Truba and METTSCO).

Coordinate thru E-mail with our designer (TME – TechMaster Engineering), which (was in

Cyprus) is presently in Beirut, Lebanon, regarding drawing related problems.

Coordinate and Inspect site in case of interferences against other disciplines or existing utilities

not shown in the previous as-built drawings and make actual site measurements as needed.

Finalized as-built drawings for Jizan CPS Extension 2 Project (Optional Unit)

Jizan 1 Project:

Finalize remaining drawings for Jizan CPS Ext. 1

Being the only one on site who edited 3D drawings imported from 3rd Party Design Software

proves my extensive knowledge in AutoCAD!

Asir Project:

Finalize remaining drawings for Asir CPS Extension 1

Jeddah HO:

Various Projects.

Riyadh PP-9 Project:

Work for four months in Material Department handling material documents.

COMPANY POSITION INCLUSIVE PERIOD

(4). Nesma & Alfadl Cont. Co. Sr. Draftsman/ March 17, 1994 to

Al Khobar, K.S.A. AutoCAD Rel.12 Sept. 18, 1996

Projects:

Petromin Shell Refinery – Jubail Headquarters Building and Associated Facilities – One Year

Various Projects at Head Office – 6 Months

o MODA - Bahrain : Helicopter Hangar

o MODA - Riyadh : Maintenance and Transportation Facilities

o MODA – Gizan : Installation of Battalion Camp

Page 3 of 4

o MODA - Jubail : General Installation of Patriot Battalion

Job Description:

Convert contract drawings into full shop drawing for site execution.

Prepare material take-off based on approved drawings (if no one is available to do so).

Prepare Architectural, Civil, Mechanical and Electrical Drawings.

Adapt design-detailed drawings that would be easily implemented at site construction

Read and Study carefully the specification requirements with tolerances and factors that

influence safety.

Coordinates internally with other engineering discipline for preparation of shop drawings to

avoid overlapping of details in site execution.

Prepare detailed Structural Drawings from sketches and design information furnished by

Engineers using Computer Aided Drafting (AutoCAD Release 12)

Conduct site inspection to create site proposals in case of obstructions (FCN) clearly

understood by the client and consultants.

Conduct site inspections to update drawings for AS-BUILT requirements.

Prepare submittal schedule & reports of shop/ as-built drawings using Microsoft Excel Ver. 5.

Create 3D Drawings when necessary

COMPANY POSITION INCLUSIVE PERIOD

(5). Royal Saudi Naval Forces Draftsman/ February 02, 1992 to

P.O.Box 61721, Riyadh, K.S.A. AutoCAD Rel.12 January 10, 1994

Job Description:

Prepare detailed drawings from sketches and design information furnished by Engineers using

manual and computer-aided drafting (AutoCAD Release 12).

Develop Standard Engineering details through simple calculations in conjunction with the

design information furnished by Engineers.

12 months hands-on experience in AutoCAD Release 12.

COMPANY POSITION INCLUSIVE PERIOD

(6). Anvil and Hammer Ind. Inc. Draftsman January 01, 1989 to

445 Manalac Avenue, Tanyag October 15, 1991

Job Description:

Design structural/ mechanical steel or reinforced concrete members.

Draft any revision of project as per Owner, Designer and Contractor’s agreement.

COMPANY POSITION INCLUSIVE PERIOD

(7). Guzman Construction Site Engineer July 01, 1988 to

Garcia st. Merville, Pqe Mmla. December 31, 1988

Job Description:

Supervise the construction of School Facilities at Don Galo Paranaque, MMla.

Page 4 of 4



Contact this candidate