Post Job Free

Resume

Sign in

Project Manager Engineer

Location:
Homosassa, FL
Posted:
October 12, 2013

Contact this candidate

Resume:

DEBORAH A. HANNA

** ******** **.

Homosassa, FL**446

Cell: 850-***-****

Email: ab94td@r.postjobfree.com

CAREER OVERVIEW 29 years of construction experience including

commercial nuclear, Department of Energy (DOE), and

consulting. Functional area expertise includes Document

Control, Records Management, Procedure Workflow, Emergency

Preparedness, Corrective Action, Self-Assessment,

Benchmarking, Operating Experience, Contract Management,

Project Management, and Field Engineer.

EDUCATION 2004 Masters in Business Administration

Webster University Ocala, FL GPA 3.51

1979 B. S. in Business Administration

Francis Marion University Florence, SC GPA 3.25

EMPLOYMENT HISTORY

2/13 - 5/13 Baker Concrete Construction (Savannah River Site)

Quality Engineer

Responsible for the review and turnover of the Quality

Assurance Records for the Waste Solidification Building

(WSB)System under construction at SRS. Ensured that records

were complete, accurate, reviewed, and accepted by the

Department of Energy (DOE).

7/12 - 12/12 Shaw Modular Solutions (SMS) Lake Charles, LA

Quality Engineer

Responsible for the review and turnover of assembly Quality

Assurance Records for the AP1000 Modules being fabricated

in Lake Charles, LA. Ensured that records were complete,

accurate, reviewed, and accepted by Shaw Nuclear Solutions

(SNS) and then captured in the doc base Documentum pending

the authorization to ship modules. Quality Assurance

records were then seamlessly transferred to the Vogtle or

Summer Site for acceptance by the client.

8/05 - 8/11 Progress Energy Crystal River Unit #3

Lead Contract Management Specialist - Major Projects

Oversee the development of contracts for construction

projects which included reviewing & clarifying scope

documents, ensuring a wide variety of bidders were

selected, evaluating bid packages for technical &

commercial terms and selecting the best evaluated

contractor to complete the scope of work. Also ensure the

contractors are processed in, and work begins on schedule.

Follow field activities and ensure all work is complete in

accordance with the contract, amendments, and field

changes. Complete closeout of the contract documentation

and vault the quality record. Also was the PGN

representative over the Bechtel workforce during the Steam

Generator Replacement Outage.

8/03 - 8/05 Supervisor of Regulatory Support (CR3)

Responsible for Emergency Preparedness and Self Evaluation

Programs (Corrective Action, Self Assessment, Benchmarking

and Operating Experience).

5/99 - 8/03 Superintendent of Documents Services (CR3)

Responsible for Document Control, Records Management,&

Procedure Control Programs. In parallel, filled the

position of Project Manager for the construction of the

Cafeteria & Conference Bldg and the Citrus Co Radio System.

During R13, I served as PGN Rep over the Areva contract for

the PZR Upper Nozzle Repairs and the HPI Thermal Sleeve

Replacement.

5/97 - 5/99 Site Project Manager Robinson Nuclear Plant (RNP)

Responsible for the design and development of an Electronic

Document Management System (EDMS)

5/93 - 5/97 Supervisor, Document Services Brunswick Nuclear Plant

(BNP)

9/92 - 5/93 Integrated Management Services (BNP)

Structural Field Engineer (BNP)

During the BNP extended shutdown, responsible for the

closeout of Emergent Structural mods including field

walkdowns and operability turnovers.

6/89 - 9/92 Westinghouse Savannah River Co. (Savannah River Site)

Document Control Supervisor & Records Turnover Specialist

Responsible for establishing document control satellites at

two (2) production reactors and implementing a records

management system for all records turned over by DuPont.

10/88 - 6/89 Eiland Clark Associates, Inc. (TMI, Oyster Creek)

Consulting Records Analyst

Provided onsite professional and technical services in the

development and implementation of records management

systems @ Three Mile Island (TMI), Oyster Creek, GPU

Corporate, and United Illuminating Corporate.

4/84 - 10/88 CP&L & Metric Constructors, Inc. (RNP)

Records Turnover Reviewer & Document Control Assistant

Responsible for control of all documents inside

containment that were directly related to the Steam

Generator Replacement Outage (SGRO). After completion of

the outage, responsible for the preparation, final review

and turnover of all mod packages and applicable QA records

verifying the SGRO.

11/79 - 10/83 AVX Corporation - Myrtle Beach, SC

Quality Control Supervisor

Responsible for supervising 25 quality control inspectors

who performed a wide range of inspection procedures.

Ensured that the product met acceptable quality standards

for in-house and customer specifications.



Contact this candidate