Post Job Free

Resume

Sign in

Sr. Drilling Engineer & Drilling Supervisor

Location:
Iran
Salary:
8000 USD/month
Posted:
September 29, 2013

Contact this candidate

Resume:

Resume

> Personal Data:

. Name Majid Rouhi Vejdani

. Date of Birth 28/03/1978

. Gender Male

. Marital Status Married

> Education:

Bachelor degree in mechanical Engineering in Guilan University(1997-2003)

> Career Summary / Objective:

Senior Drilling Engineer with over 8 years of experience in engineering and

supervisory disciplines. The majority of recent experience gained in

drilling, with previous initial experience in Workover, well interventions,

Completion and well testing. Involved in all aspects of drilling from

conceptual / feasibility studies, detailed well planning, technical bid

evaluation of drilling equipment, assessment of service contractors,

technical studies, and a significant amount of offshore supervision

experience. A highly motivated individual and excellent team player with

experience in different types of offshore drilling problems and a creative

thinker to solve operation problems.

> Total Work Experience:

1. Dana Drilling Co. (drilling operator) 2006-current

Sr. Drilling Engineer & Drilling Supervisor

2. Fara Sanat Mahak 2004-2006 Mechanical Engineer

> Certificates:

. Program / Course Duration (month/year)

IWCF Certificate from GTSC Abu Dhabi

HUET Certificate

Landmark drilling suite

Introduction of DRILLING OFFICE software in ICOFC.

1- Advance Cementing Procedure

30 hours / 2008

2- Bit selection in ICOFC.

30 hours / 2008

3- Casing Design

50 hours / 2008

4- Drill Stem Design

50 hours / 2009

5- Fishing Procedure

50 hours / 2009

6- Well control

20 hours /2009

7- Wellview Software 20 hours

8- Solidworls software

1 month/2006

> Qualifications and Project Experience:

Senior Drilling Engineer 2011-Current

1. Project Phases 17B & 18B of South Pars in Gulf (Drilling 20 development

gas wells, 1 appraisal and 1 Vertical Wells):

. Data Gathering and Evaluation Process: Data collection from

nearby wells and Processing Drilling Data in order to prepare

Drilling recommendations and identifying potential problem

zones.

. Evaluating drilling services requirements and preparing

technical scope of work in order to finalize drilling

services contracts.

. Preparing Technical Tender Documents for ITT (Invitation to

tender) and submitting to all service contractors, including:

Mud Logging, Directional Drilling Services, Casing Running,

Cementing, Coiled Tubing, Electrical Logging, Drilling Fluid

Services, Well testing Services, Coring Services, Fishing and

Equipment Rental Services and etc.

. Review Technical offers of drilling Equipment and prepare

Technical Bid Evaluation for all drilling Equipment, such as

Wellhead & X-mass Tree which is semi-compact type and

selecting appropriate components such as Actuators with

specific oil volume, opening and closing time and back

pressure valve as well, Liner Hanger and completion

Equipment, including CRA Liner Top Isolation Packer and Tie

back Assembly with its rental tools, Polish and top dress

mill with scraper, dummy seal assy, Conductor Pipe and

various size of Casing, Liner and Tubing, Tubing Retrievable

sub surface Safety Valve(TR3SV) with self-equalizing system,

Control Line and cross coupling protector and Bit selection.

. Preparing Drilling Program for each section including Mud

Program, Cement Program, Bit selection & Hydraulic, BHA

Design, Wellhead Diagram and Directional Trajectory Plan.

. Planning Completion Procedure and issuing Completion Program

in drilling Team with great consideration to Gas Wells

criteria.

. Lead the team from tendering phase to drilling phase.

. Well construction calculation, including casing design,

drillstring design and well aware of Well control procedure.

. Directional Trajectory Plan, Anti collision monitoring and

wellbore tracking with Landmark Software.

Preparing AFE (Authorization for expenditure) Preparing End of Well

Report (EOWR)

Drilling Supervisor 2009-2011

. Working as Night Drilling Supervisor and Senior drilling

Supervisor on Perro Negro 3 (SPCM) and COSL STRIKE Jack up,

supervision daily operation, supervision of service

companies' performance and directing drilling operation in

accordance with drilling program and trouble shooting of any

problems during operation and reporting to operation Manager.

Planning Casing Running operation and supervising all

involved personnel including Rig crew, casing running

operators and Mud loggers to have job accomplished.

Reviewing Cement Program and cement recipie, displacement

volume and supervision of job to make sure having good cement

around shoe, correct calculation for bumping the plug and

calculation of Mud return and Losses. Planning Completion

operation and precise Space out for landing Tubing Hanger and

Anchor Latch assembly in place, coordination for Wireline

Logging including CBL/VDL, fullset Log and applying TPL

method in long high deviated directional Well and planning

for TCP (Tubing Convey perforation) Job

drilling hole section as follows:

1- 32" Hole section: running and cementing 26" Conductor

Pipe.

2- 24" Hole section: running and cementing 18 5/8" Casing.

3- 16" Hole section: running and cementing 13 3/8" Casing.

4- 12 1/4" Hole section: Combination Casings (10 " X 9 5/8")

5- 8 " Hole Section: 7" Liner + 7" Liner Hanger and cemented

same.

6- Running 7" monobore Completion: Top Packer+ Tie back seal

assembly +

7" CRA Tubing + 7" TR3SV with Completion Fluid.

Operation Drilling Engineer(Well Engineer) 2008-2009

. Working in basis of 2 weeks rotation on offshore

Rigsite(Jackup) as a Operation Drilling Engineer preparing

Inventory of Equipment and Material on the Jackup and

preparing detailed working procedure for drilling, casing and

cementing operation, creating Daily drilling Report (DDR)

with Wellview Software and 2 weeks at office Preparing and

selecting List of Equipment for upcoming operation and

preparing EOWR for each well, creating daily progress chart

(depth v time)

Drilling Engineer 2006-2008

. Working as a office drilling engineer: Preparing Technical

Tender Document at office, preparing daily cost of drilling

including Rig rate, service companies' cost and logistics'

expenses such as Feul, Supply Boats' daily rate and etc,

while attending in various training drilling courses held by

Company.

. Attending in onshore Rigsite reqularly in order to get

familiar to drilling activities and fulfilling assigned tasks

and reporting the results to head office. Cooperation with

drilling Team at office and preparing Technical Bid

Evaluation, AFE and technical Tables. Following drilling

operation under supervision of Drilling Lead and assisting

drilling Team in Invoicing, BOM, preparing drilling progress

charts and monthly progress reports for Client.

Invoicing and Cost Evaluation of Operatin in

Project Phases 9&10 of sout Pars

Field in Gulf/ Directional Drilling service

Joint with Almansoori on SAGA I & SAGAII

Jackups.

Specialties

- Drilling Engineering included preparing drilling program,

completion program and detailed working procedure

- Drilling operation supervision

- Well Construction calculation

- Technical Bid evaluation

- AFE

- Landmark drilling suite

> Language Proficieny: (native / advanced/ intermediate / basic)

. Persian native

. English advanced : Academic IELTS Exam : 6.5

. French ...

. German elementary (Zertifikat Deutsch)

. Others ...

> Computer Knowledge:

. Windows, Internet, Microsoft office (Word, Excel, Power Point,

Outlook)

. Drilling Suite Landmark

. Solidworks Software

. Autocad Software

Email Addresses: ab85kq@r.postjobfree.com

ab85kq@r.postjobfree.com

Mobile No: 0098 912-***-****

Dana Kish Drilling Co. (Drilling Operator)

Dana Group



Contact this candidate