design,construction,operation and maintenance of substations

Location:
Fremont, CA
Posted:
August 31, 2013

Contact this candidate

Resume:

Arturo Tanjoco

***** ********* **, ******* ** ***36

510-***-****

Work Experience

Sept. 2009 – July 16, 2012 Electrical Designer – Lopez & Associates Engineers El Monte, CA

• Involved in the preparation of substation physical design (above & below ground) and some

control/protection wiring design of various SCE substation projects in accordance with

approved scope of work and SCE standards.

Accomplished Substation Projects:

• Walnut - Replacement of 280 MVA, 220/66/12kV power t ransformer.

• Bailey - Replacement of 280 MVA, 220/66/12kV power t ransformer.

• Vista - Replacement of 280 MVA, 220/115/12kV power t ransformer.

- Replacement of 220kV and 115kV disc switches.

- Replacement of 115kV and 66KV circuit breakers.

• Gorman – Upgrading of relay house electrical equipment and devices including

replacement of AC/DC panel, installation of LA, PT.

• Universal – Replacement of circuit breaker and PT’s.

Nov. 2007 – Dec. 2008 Electrical Designer – Ocampo Esta Corporation, Vallejo, CA

• Involved in the preparation of substation design, outdoor design (physical) and indoor design

(control and protection) of various PG&E substation projects, in accordance with approved

scope of work and PG&E standards.

Accomplished Projects:

• Outdoor substation design: Henrietta, Panoche, Wheeler Ridge

• Indoor substation design: Pueblo, Highway, Fairhaven, Atascadero, Rio Oso

2004 -2007 Consultant – First Bay Power, Bauan, Batangas, Philippines

• Preparation of bid in the management/ sale of Banuan Electric Light.

• Conduct due diligence, data gathering, load survey/system loss analysis and preparation of

system one line diagram.

• Prepared Five-Year Distribution Rehabilitation plan including initial design/budget.

• Voltage conversion, reconducturing, power factor of correction, replacement of distribution

t ransformers, meter calibration/replacement, balancing of load, line conversion and substation

i nstallation.

• Implementation of the Five-Year Rehabilitation plan.

• Securing approval of environmental, government permits, coordinate interconnection with

power supplier, preparation of design, procurement of equipment, construction methodology,

t raining of personnel – operating and safety procedures.

2000-2004 Consultant

• Various substation projects installation; assembly of power t ransformers; power transformer

reconditioning and testing.

1997- 2000 Manila Electric Company, Pasig City, Philippines

• Team Leader, Transmission Lines

- Supervised the construction of various 115kV transmission line projects.

• Team Leader, Substation Division

- Supervised the electro-mechanical works in the installation of various SF6 switchgear (gas

i nsulated switchgear) for various substation projects including testing and commissioning.

• Team Leader, Project Management Office

- P roject Management of Various Meralco t ransmission/distribution lines and substation

p rojects.

1983 – 1997 Meralco Industrial Engineering Services Corporation (Miescor), Pasig City, Philippines

• Head, KFW substation projects

- M anaged the civil works construction of various KFW GIS substation projects.

• Head Electrical Construction and Allied Services (Miescor Builders, Inc.)

- Construction, installation, maintenance of various transmission/distribution and substation

facilities for electric utilities, commercial and industrial customers including testing, t rouble

shooting, repair of various electrical facilities, repair, rewinding of distribution and power

t ransformers.

• Project Manager, Dolores substation project

- Supervised the construction, installation of the 3-300 MVA, 230kV substation project.

• Project Manager, Caloocan Navotas Malabon 115kV transmission line project

- Supervised the construction of the 115 kV t ransmission line including on shore portion of the

l ine (from power barge).

1974 – 1983 Manila Electric Company, Pasig City, Philippines

• Substation Supervisor – Substation Division

- Supervised the construction, installation, operation and maintenance of various Meralco

substations, transformer vaults, underground distribution facilities, trouble shooting of

customer owned substations.

• Assistant Substation Supervisor – Substation Division

- Assist the Substation Supervisor in the construction, installation, operation and maintenance

of various Meralco substations, transformer vaults, underground distribution facilities, t rouble

shooting of customer owned substations.

• Staff Engineer – Substation Division

- Prepared budget/variance report of the division.

- Prepared monthly accomplishment report of various construction projects.

- Monitored operation and maintenance performance.

- Monitored performance of substation equipment.

- Supervised substation battery crew.

1972 – 1974 Cadet Engineer – Manila Electric Company, Pasig City, Philippines

- Two years on the hob t raining in the generation, transmission and distribution of

electricity.

Education: Bachelor of Science in Electrical Engineering, 1971

Professional License: Professional Electrical Engineer, PRC # 1660

Seminars/Trips: IEEE Convention, Anaheim USA, Pauwell Belgium, Coelme Italy

Other: 1974 – 1978 Part-time Instructor - College of Engineering - University of the East Manila, Philippines