Post Job Free

Resume

Sign in

Environmental Management

Location:
Belmont, NC
Salary:
60000
Posted:
August 27, 2013

Contact this candidate

Resume:

NICHOLAS A. MAURO

**** ******* **** *******, ** *8012 607-***-**** ab5xu1@r.postjobfree.com

EDUCATION

Bachelor of Science: Water Quality Management, minor- Business Management 2010 to 2012

Metropolitan State University of Denver, Denver, CO

Associate of Occupational Studies: Building Trades- Building Construction 2002 to 2004

Alfred State College, Alfred, NY

Associates of Arts: Liberal Arts 1999 to 2002

Orange Coast College, Costa Mesa, CA

WORK EXPERIENCE

Richmond American Homes, Denver, CO 2013

Superintendent

• Implemented positive performance and high quality results through organizational techniques of

purchase order and delivery, conflict resolution, planning and scheduling using AS400

technology, and perseverance for fast paced tract home production

• Directed overall operations through resource management while displaying ability to work

independently as well as coordinating vendor relationships, government agencies, and clientele

North Forest Office Providers, Pittsford, NY 2008 to 2010

Construction Manager

• Continued development of 5 professional office parks with consideration to environmental

wetland conditions while maintaining OSHA and EPA regulations

• Increased corporate relationships and potential business targets by joining public network

consulting groups to enhance revenue and sales

• Executed cost management and budget analysis for individual project applications, employee and

contractor reviews, in addition to influencing the hiring process to generate successful project

organization and prioritizing workloads

Foothills Commercial Builders Incorporated, Aurora, CO 2007 to 2008

Superintendent

• Gained strong organizational and problem solving abilities by successfully leading scheduled

construction for up to 7 immensely detailed projects simultaneously

• Ensured client satisfaction by monitoring contractual agreements and continual addendums of

design engineered plans

D.R. Horton- Melody Series, Centennial, CO 2005 to 2007

Superintendent

• Represented management of 16 building projects after becoming reputable for high standards and

attention to detail, ensuring superiority in finished products

• Grew relationships with 7 state and local regulatory districts while building connections with

over 50 subcontractors and more than 300 staff members to assemble a highly productive team

• Conformed scheduling of up to 40 homes simultaneously ranging from $250,000 to $1 million

that yielded continual increased production while maintaining brand excellence and integrity

RESEARCH

NICHOLAS A. MAURO

1724 Gaither Road Belmont, NC 28012 607-***-**** ab5xu1@r.postjobfree.com

Internship: Parker Water and Sanitation, Parker, CO 2012

• Presented statistics in morning briefings on previous days field inspections, well logs, chemical

monitoring, and laboratory results to strategize and implement necessary subsequent obligations

• Managed risk including lock-out/tag-out inspections, daily water quality logs, SCADA

programming, and EHS practices used to ensure proper operating procedures

• Conducted daily water sampling and analysis to ensure chlorine concentrations of 0.5mg/L

resulting from assessment of silt fence, sediment logs, sediment traps, and sediment basins used

successfully to reduce hydraulic energy and filter sediment-laden runoff of construction sites

Limnology of South Platte River, Lake George, CO 2012

• Technical water quality reports determined excellent aquatic ecology through field investigation

to exemplify results for annual EPA regulations

• YSI multi-probe testing, and Serber Sampler testing illustrated dissolved oxygen concentrations

of 9.2 mg/L at 60% saturation levels, conductivity below 500 µS/cm (micro-Siemens per

centimeter), and an average pH of 8.7

• Backpack electro shocking aided 88.6% of fishes in fair or better condition using weight and

length to calculate physical health using Fulton’s Condition Factor

Stream Gaging of Cherry Creek Platte River, Littleton, CO 2012

• Calculated an 8.9 cfs (cubic feet per second) loss of discharge over a 10 day period with

received 56% annual watershed based on hydrologic modeling, statistical GIS data analysis of

field activities, and multi-media sampling to technically evaluate stream discharge

Stratton Spring Water Evaluation, Manitou Springs, CO 2011

• Assessed laboratory steady flow rate velocity of 0.143L/sec and pH measure of 6.24 to show low

concentrations of ion analysis through water quality assessment and laboratory chemical analysis

ensuring a palatable water source

CERTIFICATIONS

US Department of Labor Occupational Safety and Health Administration

30-hour OSHA training in Construction Safety and Health 2004

10-hour OSHA training in Construction Safety and Health 2002

PROFESSIONAL LICENSE

State of Colorado Class D Water Operator and Certified Water Professional (CWP) 2012

ACTIVITIES

• Volunteering for the Greenway Foundation improving conditions of local rivers

• Avid outdoorsman that enjoys hiking, biking, camping, skiing, golfing, and gardening

• Staying physically fit is a major component that entices me to workout daily

• A leisurely day of boating, water sports, and fishing is irresistible

• Home remodeling projects are enjoyable and easy to gain satisfaction by seeing rapid progress



Contact this candidate