Post Job Free

Resume

Sign in

Engineer Electrical

Location:
Jonggol-Bogor, West Java, 16830, Indonesia
Posted:
August 14, 2013

Contact this candidate

Resume:

Page * o f *

Curriculum Vitae

Doddi Asbir

Nyangegeng, RT/RW: 003/001 Desa/Kel.Singajaya,Jonggol

Bogor – West Java. Indonesia. 16830

Mobile : +62-878********, +62-857********

Email : ab4lbo@r.postjobfree.com

Personal Information

Nationality : Indonesian

: Bangka Belitung, 10th August 1975

Place/Date of Birth

Marital Status : Married

Passport : W062220 ( Valid until 2016)

Saudi Arabia Visa : 85462613 (Valid until May 2012)

Educations

1995 – 1999 HND Electronic

Majoring Electronics Engineer Department

Study Program of Instrumentation and Control System;graduated with 3,50 GPA

Timah Polytechnic for Manufacturing - Indonesian

POLMAN TIMAH (www.polman-timah.ac.id)

1991 – 1994 Senior High School in SMA Negeri 3 Pangkal Pinang, Bangka Belitung

Working Experiences

July 2,2012 – July 3, 2013

PT. TeamworX Indonesia, Jakarta - Indonesia, New Liquid Factory Construction PT.MANE Indonesia,

Construction Department, as Senior MEP Coordinator/Site Engineer. Location : MM 2100 Area

Industry Cibitung – Bekasi, West Java - Indonesia

Descriptions of Job :

Establish appropriate channels of communication between members of project.

To coordinate site works and ensure them completed in accordance with client requirement & schedule.

To provide all technical data with an understanding needed by the supervisors.

To ensure good working practices are being used to carry out the works in the most cost efficient manner.

To ensure the contractors are provided with all necessary information and drawings in advance of each work

activity.

To ensure conformance to design specifications and safety or sanitation standards.

To obtain client’s authorization for cost variation.

To assist client in mechanical design activities.

Page 2 o f 3

December 8,2008 – April 28,2012

Saudi Paper Converting Co, Jeddah- King of Saudi Arabia, Tissue Paper Converting Bussinees,

Maintenance Department,as Electric Supervisor and Senior Electrician Planner.

Descriptions of Job :

Instrument Field, Instrument Process Control, PLC/DCS System, Electrical Standard, Power System,

Low Voltage & High Voltage, Electrical Wiring Diagram and SLD's.

Supporting and making report to Maintenance Manager in evaluated maintenance progress

Making schedule with CMMIS electrical prepentive maintenance for technician

Responsibility and Supervisor about working electrician team

Responsibility Designing and Improving electrical control system for new converting machine ;

Conveyor system, Rewinder roll, Toilet roll machine

Problem solving and action plan if happened trouble and breakdown machine ; checking trouble

from electric or mechanic control, Instalation and PLC programming.

October 15,2003 – December 3,2008

Graha Kerindo Utama Co, Gramedia Company Groups,Cikarang Barat,Bekasi- Indonesia,Tissue

Converting Engineering Bussinees (Tessa Tissue),Maintenance Department, as Senior Electrical

Engineer Staff Position.

Descriptions of Job :

Making Schedule electrical preventive maintenance tissue converting machine

Prepare schedule training ; Electrical drawing with AutoCAD Electrical software, PLC programming,

AC/DC Servo motor, Stepper motor, Induction AC motor, Inverter AC motor, Electric Pneumatic

and Hydroulic control

Research and Development Converting machine for improving increase tissue production.

Supporting Supervisor and Manager in evaluated maintenance progress

Designing and Improving electrical control system for new converting machine ; Conveyor system,

Rewinder roll, Toilet roll machines

Problem solving and action plan if happened trouble and breakdown machine ; checking trouble

from electric or mechanic control, Instalation and PLC programming.

May - June, 2006

AL-HAJRI CORPORATION COMPANY, Abudhabi-Uni Emirat Arab,Queenex Tissue Converting

Businees,Maintenance Department,as Commisioning and Electric Control System Engineer.

Descriptions of Job:

Assembling and Electrical control instalaltion automatic facial wrapping machine

Making PLC program for control machine used S7-200 Siemens

Commisioning machine in order that running well and good production

Training operation machine for employee and Engineer Quenexx tissue factory.

2002 – 2003

Citra Indah Developer Company,Ciputra Groups,Cibubur-Indonesia,Real Estate Developer

Bussinees,Mechanical and Electrical Department,as Senior Electrical Engineer.

Descriptions of Job :

Control and monitoring schedule progrees contractor in develope real estate home,building for

electrical instalation and water drainase.

1998 – 2002

TIMAH MINING Tbk Co,Timah Polytechnic of manufacturing,Bangka Belitung-Indonesia,Tin Mining

Exploration Bussinees,Electronic faculty Department,as Instructor Staff and Research Production.

Descriptions of Job :

Instructor;Electrical Instalation,Electronic Digital,Pneumatic and Hydroulic Control,Programmable

Logic Controller (PLC)

Head Electrical Laboratory Class.

Page 3 o f 3

Coordinator class practise PLC programming,Pneumatic and Hydroulic Control

Research and Development Tin mining exploration control.

Projects ;

- Project : Gases Detector Interface with PC.

- Project : Leakage Detector Project for tanks/compartment Tin Mining Exploration Ria Ship.

- Project : Automation Control Project for Tin Mining Exploration Kundur Ship.

Summary

Special Qualification:

Instrument Field, Instrument Process Control, PLC/DCS System, Electrical Standard, Power

-

System, Low Voltage & High Voltage, Electrical Wiring Diagram and SLD's.

Network communications and PLC programmer; Siemens, Mitsubishi, Omron, Nais, Festo,

-

Alen Bradley, and Fanuc.

Touch Screen or Human Machine Interfaces (HMI)

-

Production Process (Scheduling)

-

Material Requirement Planning (MRP)

-

Maintenance procedure, and Electrical Trouble Shooting

-

Electric monitor maintenance & repairs

-

Transformers, inverters, power monitoring systems

-

MV/LV distribution and protection systems

-

Technical Graphic ; AutoCAD 2004, Electrical Drawing AutoCAD2006, MATLAB Elect

-

software, Electronic Workbench Ver.04 software

Job Training, Seminar and Certificates

Construction Management in Maintaining a High Quality Project, Bogor, June 1st, 2013

Sharing Experience & Knowledge for M&E of Construction Management, Jakarta, December 15th,

2012

Computerized Maintenance Management Information System (CMMIS) Training from SAMI,

January 2009,SPC Company, Damam-Saudi Arabia

English Convertation Courses at GKU Company, January 2006, Bekasi City - Indonesia

Joined Courses for Seamless Network Solutions at Omron Electronics Company, July 2005, Jakarta

City – Indonesia

Joined Workshop Elementary Automation Industry Technologi at Festo Company, February 2004,

Jakarta City – Indonesia

Joined Seminar of “ Menghadapi Perubahan Secara Proaktif “ at Ciputra Indah Company with

Franklin Organization Services, January 2003, Jakarta City – Indonesia

Joined Courses of “ Mempersiapkan Pendidikan POLMAN yang Profesional dan Kewirausahaan “ at

Bangka Island Outdoors Tin Mining Company, 15 Feb – 18 Feb 2001, Bangka Island – South

Sumatra

Joined Courses of NEBS MANAGEMENT of educations at Tin Mining Tbk Company, September

2000, Bangka Island – South Sumatra

Joined Courses of “ BIO – PKBP di Alam Terbuka“ at Bangka island Outdoors Tin Mining Company,

18 – 20 September 1998, Tanjung Batu Bangka Island – South Sumatra

References

1. Mr. Haitham Azzam, Production Manager, Saudi Paper Converting Co.

Email: ab4lbo@r.postjobfree.com

2. Mr. Agustinus Sugiyanto, Maintenance Manager, Graha Kerindo Utama Co.

Email: ab4lbo@r.postjobfree.com

3. Mr. Sandi Suhardi, M&E Manager, Ciputra Developer Co.

Email: ab4lbo@r.postjobfree.com



Contact this candidate