Resume

Sign in

Engineer Power Plant

Location:
Durg, Chhattisgarh, India
Salary:
7 lakhs
Posted:
July 17, 2013
Email:
ab1qu9@r.postjobfree.com
Contact Info:
***********@*****.***


CURRICULUM VITAE

CORRESPONDENCE ADDRESS:

S/O Shri - Gyan Das Banjare

Vill + Post - Hadgahan

Thana - Arjunda

Distt. - Durg (C.G.) - 491225

( Mobile No. - 09993453443, 08305695864

(E-Mail ID - ab1qu9@r.postjobfree.com

[pic]

CHANDRASHEKHAR BANJARE

ME (Heat Power Engg.) + BE (Mechanical Engg.) + Diploma (Mechanical Engg.)

Thermal Power Plant Commissioning, Operation & Maintenance Engineer (6.6

Years)

[pic]

CAREER OBJECTIVE-

> To utilize my Technical knowledge in growth of the organization and

gain practical work experience & expend my knowledge base. I work to

the fullest of my capabilities with result oriented approach and

remain open for new challenges in the best of my organization's

interest.

PROFESSIONAL WORKING EXPERIENCE-

> 6.6 Years Experience in Commissioning, Operation & Maintenance

activities of Thermal Power Plant including Boiler (PF- Once through

Supercritical Boilers, CFBC, AFBC & WHRB Boiler), Steam turbine

(Extraction cum condensing type), Coal handling plant and Ash handling

plant etc.

CURRENT EMPLOYER-

> M/S INDO ENGINEERING PROJECT CORPORATION at a site of TALWANDI SABO

POWER LIMITED, VEDANTA GROUP (3x660=1980 MW), Distt.-Mansa (Panjab).

Indo Engineering Project corporation (IEPC) is an ISO 9001-2008

Certified Company. IEPC provided Commissioning and Operation &

Maintenance Assistant Service on contact base at a Site of Talwandi

Sabo Power Limited (TSPL), Vedanta Group (3x660=1980 MW).

Boiler- Harbin Boiler Company Ltd (HBC) make 3x2140 TPH, Supercritical

Boiler, Pulverized Fuel, Wall Single Tangential fired, Balanced Draft,

Main Steam outlet Pre. - 25.4 Mpa & Temp. - 571 C, Reheated Steam

outlet Pre. - 4.6 Mpa & Temp.- 569 C.

Turbine-Don fang Turbine Co. Ltd, make 3x660 MW Supercritical, one-

middle reheat, single-shaft, three cylinders, four exhaust steam

chamber type Steam Turbines, Main Steam inlet Pre. - 24.2 Mpa & Temp.

- 566 C, Reheat Steam Inlet Pre. - 4.2 Mpa & Temp.-566 C.

Designation:- Shift-In-Charge Cum Site Co-ordinator (Commissioning &

Operation Engineer)

Duration:- 4th December 2012 to till Date

Job Profile (Key Responsibilities):-

> Involved as a member of various Pre-Commissioning, Commissioning and

Operation teams with Talwandi Sabo Power Limited (TSPL) Thermal Power

Plant (3x660 MW) in area of PF-Supercritical Boilers, Mills, Steam

turbines with its related auxiliaries & all the balance of plants,

Coal Handling Plant and Ash handling plant etc.

> Working as Commissioning Engineer & Operation Engineer.

> Carried out the various pre-commissioning & commissioning activities

such as:-

. Boiler hydrostatic-test (1.5 times of design pressure)

. Preparing flushing plans of for the smooth and fast pre-

commissioning of the complex.

. Boiler Chemical cleaning and Acid Cleaning.

. Review of the china make plant PFD's /P&ID's/ Equipment data

sheet, isometric drawings.

. Knowledge of china makes equipments.

. Condenser flood test & air leak test as a commissioning

engineer.

. Card board blasting, Acid cleaning, Air blowing and oil flushing

of lube oil system lines & HSD lines.

. Oil flushing of Lube oil System of MDBFPs, Fans and Ball Mills.

. Turbine oil system flushing incorporating all the piping as a

commissioning engineer.

. Documentation of work instructions (SOPs).

. Documentation of protection & interlocks values.

PREVOIUS EMPLOYER-

1. M/S THERMAX LIMITED (O&M-POWER DIVISION) at a site of BHARAT OMAN

REFINERY LIMITED, Bina, Distt.- Sagar (M.P.).

Thermax Limited (O&M Contract) at a Site of Bharat Oman Refinery

Limited, Bina, Distt.- Sagar (M.P.). BORL have own captive power plant

having total capacity 99 MW. Boiler-BHEL makes CFBC Boiler (3x275 TPH,

Single drum natural circulation water tube hot cyclone non-integrated

FBHE type).

Turbine-BHEL makes Steam turbines (3x33 MW Impulse-reaction triple

controlled extractions cum condensing type).

Designation:- Operation-In-Charge (Operation & Maintenance)

Duration:- 12th August 2010 to 2nd December 2012 (2 Years and 4 Months)

Job Profile (Key Responsibilities):-

> Involved as a member of Commissioning team with BHEL make CFBC Boilers

(3x275 TPH), Steam turbines (3x33 MW Impulse-reaction triple

controlled extraction cum condensing type) with its related

auxiliaries & all the balance of plants.

> Carried out the various pre-commissioning & commissioning activities

such as:-

. Boiler hydrostatic-test (1.5 times of design pressure) from feed

control station up to MSSV.

. Preservation and Passivation of boiler and its parts and

Refractory dry-out.

. Types of flushing of service water line, feed water line &

condensate system with detergent, Chemical cleaning, Acid

cleaning, Alkali boil-out & Steam blowing, Air blowing of

instrument, plant air & nitrogen lines.

. Safety valves setting & floating of boiler drum and main steam

line.

. Prepare no load & load trial test runs of various equipments

such as motors, pumps, motor drive BFP, turbine drive BFP,

diesel drive BFP, initial boiler filling pumps, main cooling

water pumps (MCW), auxiliary cooling water pumps (ACW), turbine

drive auxiliary cooling water pump (TDACW), export cooling water

pumps (ECW), condensate extraction pump (CEP), blow down Pump,

HP & LP dosing pump, soot blowers, root blowers, blowers,

turbine oil purifier system (centrifuge), hydraulic scoop,

cooling tower fans, Oil vapour extraction fans, vapour

absorption machine (VAM), ash conveying compressor and plant air

compressor, ID, PA and SA fans etc. association with sequence,

permissive, interlocking, protections, indication, alarms and

annunciations from field & DCS.

. To check the behaviors of the various equipments with optimum

operation parameters and its reliable suitability to put into

regular service.

> Looking after the operation & maintenance of coal based CFBC boilers,

steam turbines (extraction cum condensing type) with its related

auxiliaries, the utility services and all the balance of plant

equipments according to SOP from field & DCS (Centum CS-3000

Yokogawa).

> Handling operation & maintenance of offsite steam supply to refinery

(process Steam) through large PRDS network. (HP steam- 40 TPH, 38

kg/cm2, 400 0C; MP steam- 86 TPH, 18 kg/cm2, 290 0C and LP steam- 90

TPH, 5 kg/cm2, 220 0C).

> Operation of power plant including start up, shut down and handling at

any emergency situation & understand and able to perform all emergency

operations.

> To co-ordination and follow up with maintenance department on status

of day to day routine maintenance, executing preventive and break down

maintenance completion.

> Basic knowledge of water chemistry specifically boiler chemistry, DM

water, steam parameters and cooling water chemistry required for power

plant.

> Managing the functions analytical, troubleshooting and preventive /

breakdown maintenance of various equipments.

2. M/S JAYASWAL NECO INDUSTRIES LIMITED, Raipur (C.G.).

M/S Jayasawal Neco Industries ltd, Raipur (C.G.) is an

Integrated Steel & Power Division with ISO 9001-2008 Certified Company

established in collaboration with the China Shougang International

Trade & Engineering Corporation. It has Captive Power Generation of 59

MW (2x15 MW, 2x7.5 MW,1x 6 MW, 2x4 MW).

Designation:- Engineer (Operation & Maintenance )

Duration:- 2nd August 2008 to 10th August 2010 (2 Years)

Job Profile (Key Responsibilities):-

> Looking after the operation & maintenance of AFBC, WHRB and Steam

Turbines (1x15MW & 1x7.5 MW extraction cum condensing type) with its

related auxiliaries & all the balance of plant equipments from field &

DCS (Centum CS-1000 Yokogawa).

> Responsibility for the safe, smooth, trouble free and efficient

operation of AFBC, WHRB and Steam Turbine uninterrupted supply of

steam, power and utility services with environment friendly manner.

> Responsibility for the safe, smooth, trouble free and efficient

operation with optimum parameter for supply cold air to Blast Furnace

through Turbo blowers.

> To co-ordination with maintenance team for day to day routine

maintenance, executing preventive, break down maintenance.

> Planning and preparation for the annual inspection, shut down and

starting of the boiler & turbine.

> Preparing daily & monthly report.

3. M/S PRAKASH INDUSTRIES LTD. Champa, Raipur (C.G.)

M/S Prakash Industries .ltd - Champa is an Integrated Steel & Power

Division with ISO 9002 & 14001 Certified Companies. It has a captive

power generation of 90 MW (2x25 MW, 1x10 MW & 4x7.5 MW).

Designation:- Junior Engineer (Operation & Maintenance )

Duration:- 2nd March 2001 to 29th July 2002 (1 Year and 5 Months)

Job Profile (Key Responsibilities):-

> Worked as Junior Control Room & Maintenance Engineer having total

Plant Capacity (2 x 25 MW, 1x10 MW & 4x7.5 MW) AFBC (CVPL) and WHRB

Boiler.

> Start up & Shutdown of Boiler as per Standard as a Control Room

Operation Engineer.

> Turbine Rolling and Synchronization as per Standard as a Control Room

Operation Engineer.

> Has Worked (Total-1 Year) in Maintenance of AFBC Boiler, Siemens Make

Turbine, AHP & CHP.

EDUCATIONAL QUALIFICATION-

> M.E. (Heat Power Engineering) from Jabalpur Engineering College,

Jabalpur (M.P.) affiliated to Rajiv Gandhi Proudyogiki

Vishwavidyalaya, Bhopal (M.P.) in year 2009 with 73.37%.

> B.E. (Mechanical Engineering) from Jabalpur Engineering College,

Jabalpur affiliated to Rajiv Gandhi Proudyogiki Vishwavidyalaya,

Bhopal (M.P.) in year 2006 with 64.31%.

> Diploma (Mechanical Engineering) from Govt. Polytechnic College,

Mandla (M.P.) affiliated to Madhya Pradesh Board of Technical

Education Bhopal (M.P.) in year 2000-01 with 70.65%.

> Passed 12th Examination from Kendriya Vidyalaya Malanjkhand, Distt.-

Balaghat (M.P.) (CBSE Board) in year 1997 with 48.00%.

> Passed 10th Examination from Kendriya Vidyalaya Malanjkhand, Distt.-

Balaghat (M.P.) (CBSE Board) in year 1995 with 48.60%.

CERTIFICATE OF PROFICIENCY-

> Qualified GATE-2006 in Mechanical Engineering having Gate Score-214.

NATIONAL PAPERS & JOURNALS-

> Publish Research paper in 'Chhattisgarh Swami Vivekanand Technical

University Research Journal' Bhilai (C.G.) in Vol-II, PP 62-66,

January-2009.

> Present two National level technical papers in 'All India Seminar on

Non Conventional/Renewable and Nuclear Energy Resources - Issues and

Challenges' at Jabalpur on 17th & 18th May 2008.

TRAINING UNDERGONE-

> Five days Rotational On Job training on 'Operation & Maintenance

Aspects of CFBC Boiler' (4x125 MW), in Gujarat Industries Power Co.

Ltd. at Surat Lignite Power Plant, Surat (Gujarat).

> Vibration Analysis & Monitoring (GE).

> Boiler Performance & Life Extension (BHEL).

> Four days vocational training during B.E. at following industries :

. NTPC, Faridabad Gas Turbine Power Station (Gas Turbine - 2x138 MW

and Steam Turbine - 1x156 MW), Vill.- Mujedi, Post.- Neemka,

Faridabad, Haryana.

. Satluj Jal Vidyut Nigam Ltd. in Nathpa Jhakri Hydro-electric

project (6x250 = 1500 MW) & Rampur Hydro-electric project (6x68.67

= 412 MW) Jhakri, Distt.-Shimla (H.P.).

> One Month's Vocational training during B.E. in NTPC Ltd, Vindhyachal

Super Thermal Power Project, (Stage-I = 6x210 MW) & (Stage-II = 2x500

MW), Distt- Sidhi (M.P.).

> Four weeks vocational training during B.E. in Malanjkhand Copper

Project (Hindustan Copper Limited), Distt.- Balaghat (M.P.).

> Two Month training during Diploma on CNC Programming & Operation in

lathe & Milling Machines from CRISP, Bhopal (M.P.).

STRENGTH-

> Quick to learn, assimilates new concepts and ability to resolve

challenging technical issues.

> Friendly, ability to lead, honest, confident, hard working, having a

positive attitude, dedicated and committed to excellence.

> Flexible with any type of technology, work environment and adjustable

under all circumstances.

PRESENT SALARY-

> CTC - 6.4 Lacs per annum + Accommodation

EXPECTED SALARY-

> Negotiable

PERSONAL DETAILS-

> Name : Mr. Chandrashekhar Banjare

> Father's Name : Shri.- Gyan Das Banjare

> Mother Name : Smt.- Kamla Banjare

> Date of Birth : 20th January 1980

> Nationality : Indian

> Marital Status : Unmarried

> Languages Known : Hindi & English

DECLARATION-

I hereby declare that the above-mentioned information

is correct up to my knowledge and I bear the responsibility for the

correctness of the above-mentioned particulars.

Date - 16/07/2013

[pic]

Place - Durg (C.G.)

Chandrashekhar Banjare