Post Job Free

Resume

Sign in

Engineer Project Manager

Location:
Loveland, CO, 80538
Salary:
90000
Posted:
July 10, 2013

Contact this candidate

Resume:

Page * of *

Douglas A. Bocek

970-***-****

ab00a4@r.postjobfree.com

www.linkedin.com/in/dougbocek

Objective: Program/Project Engineering

Summary

Exceptional Program / Project Manager

Commercial Processes

Numerous years improving manufacturing processes

Experience implementing and sustaining Material Requirement Planning (MRP) systems

Track record of resolving production issues, while reducing costs and increasing

efficiencies

Experience ensuring processing documentation meet FAA & ISO criteria

Organized and detail oriented

Lead by example

Team Player with ability to adapt quickly

Dedicated, reliable, trustworthy, and conscience

Training

Review of Terms & Conditions

Experimental design

Measurement systems analysis

Statistical process control

Gage R&R

Plant simulation software

Microsoft Office

Achievements

Program / Project Management –

Managed Commercial Process (quoting, pricing strategy and managed risk) for GE

Industrial Repair Center – averaged over 400 quotes/year with average value of $50K

Managed over 20 major Pump and Compressor projects valued at over $5 million

Managed programs for the fabrication of Carbon-Carbon composites aircraft brake disks

and hydraulic stone splitters

Developed Statement of Works, reviewed Proposals, negotiated contracts and

managed projects.

Reviewed R&D programs for their impact on both current and future production

Directed and collaborated on multi-departmental teams for the resolution of production

issues

Established and maintained specifications

Managed the implementation of material requirements and planning (MRP) systems

Performance Testing –

Developed model predicting performance of Carbon-Carbon composite aircraft Brake

disks based on current and future processing parameters

Defined test techniques and data necessary to validate predictive model

Evaluated new manufacturing processes for their viability in production

Page 2 of 4

Douglas A. Bocek

970-***-****

ab00a4@r.postjobfree.com

www.linkedin.com/in/dougbocek

Managed efforts to determine the material property requirements for carbon composites,

including the definition of the test procedures needed to acquire the data and the criteria

for acceptance of the data

Production / Process Improvement Analysis –

Analyzed the capacity of the BF Goodrich Carbon Products (Carbon-Carbon Composite

aircraft brake disks) plant and implemented equipment and utilization tracking methods

Assessed process improvement efforts for their cost and capacity impacts

Evaluated future product demands for their impact on acquiring new equipment and the

expansion of the existing facility

Professional History

GE Energy Management – Industrial Solutions, Denver, CO 12/10 – 05/13

Commercial Manager

Managed Commercial Process (quoting, pricing strategy and managed risk) for GE

Industrial Repair Centers (Denver, Salt Lake City & Langley-Canada)

Assembled Quotes

Developed Pricing Strategy

Managed Risk and Compliance

Provide assistance in developing automated quoting system

4/08 – 8/09

Sundyne Corporation, Arvada, CO

Senior Project Engineer / Manager

Managed over 10 projects

Reviewed customer contracts for accuracy and completeness

Established requirements and parts needed to meet customer needs

W orked with customer to ensure product would meet API (American Petroleum Institute)

and/or contractual requirements

Set-up projects and defined BOM (Bill of Materials) required

Managed projects thru completion

Communicated status of project to customer

Resolved production issues

Approved final data package and ensured all contract requirements were met

3/03 – 11/07

Cee-Jay Tool Company, Loveland, CO

Manufacturing Engineer / Production Scheduling

Managed the implementation of the MRP system

Managed the production schedule

Established procedures to take a Job Shop structured company and converted it into a

Production Manufacturing company using a MRP system

Integrated BOM’s and cost structure into MRP system

Issued material orders & work orders to meet production needs

Establish standard costs for all products

Helped company grow from a $3 million/yr company to one with sales over $8 million/yr

Page 3 of 4

Douglas A. Bocek

970-***-****

ab00a4@r.postjobfree.com

www.linkedin.com/in/dougbocek

3/01 – 12/01

Colorado Software Testing Laboratories, Littleton, CO

Test Engineer

Managed the testing of electronic voting software

Developed test procedures and scripts for industry-leading electronic voting software

Responsible for pre-Beta tests prior to release

1/00 – 3/01

AMSD Corporation, Canyon City, CO

Partner / Owner

Managed 3 employees & Operated small machine shop

Produced machined components for local steel mill, steel fabrication company and

textile companies

Ensured quality and customer satisfaction

1/89 – 2/00

BF Goodrich Aerospace, Carbon Products Facility, Pueblo, CO

Senior Research & Development Engineer (1997 – 2000)

Managed multiple product performance programs

Predicted performance and improved product consistency of Carbon-Carbon composite

aircraft brake disks

Defined testing techniques

Resolved production problems

Assessed new product processes to determine viability and manufacturability

Evaluated plant expansion requirements based on production and new product needs

Used Design of Experiments protocols and other techniques to analyze and generate

data

Senior Program Engineer (1989 – 1997)

Managed the manufacture of Boeing 747-400 and 777 Carbon-Carbon composite

aircraft brake disks

W rote specifications

Evaluated in-process drawings and final drawings to ensure meeting customer

requirements

Served as contact for processing technology transfer with overseas company

Managed special projects to meet strategic business goals for the production of Carbon-

Carbon aircraft brake disks

Aerojet Solid Propulsion Company, Rancho Cordova, CA 4/85 - 1/89

Senior Engineer Research & Development and Manufacturing

Managed projects in the component engineering and research & development divisions

W orked on the small ICBM, Peacekeeper and Space Shuttle Advanced Solid Rocket

Motor programs

Managed R&D projects related to Carbon-Carbon composite materials

4/84 – 4/85

Lockheed Missiles and Space Company, Sunnyvale, CA

Engineer

Managed technical interchange with UK for testing of MK4 Reentry Body’s use on

Trident Missile (emphasis on carbon composite nose tip)

Page 4 of 4

Douglas A. Bocek

970-***-****

ab00a4@r.postjobfree.com

www.linkedin.com/in/dougbocek

7/79 – 4/84

US Air Force Rocket Propulsion Lab, Edwards AFB, CA

Project Engineer (Captain)

Managed R&D programs for the testing rocket nozzle materials (Carbon-Carbon

composites)

Evaluated Proposals

Negotiated Contracts

Education

University of Akron - BS, Mechanical Engineering



Contact this candidate